C-5
3.
Move the chassis so that the mounting holes in the pallet ear of the L-type brackets align with
the mounting holes in the pallet base. Use screws to attach the L-type brackets to the wooden
pallet base, as shown by callout 2 in
and
4.
Cover the chassis with the packing bag from top down, and then tape the bag to the plastic
cover of pallet base.
5.
Place the foam cushion onto the chassis top, and make sure the mounting brackets seat into
the internal notches of the foam cushion. See callout 2 of
6.
Fit the accessory box into the rear notch of the foam cushion, as shown in callout 3 of
7.
Erect one paper corner protector along each vertical edge of the chassis, and use the carton to
cover the chassis from top down with the mark side aligning with the front panel of the chassis
8.
Close the top cap of the carton.
FigureC-4 Securing the chassis to the pallet base (S12508G-AF/S12516G-AF switch)
1
1
2
Summary of Contents for S12500G-AF Series
Page 32: ...3 15 Figure3 16 Connecting the grounding cable to a grounding strip 1 2 4 3 6 5 ...
Page 49: ...4 16 Figure4 16 Connecting an SFP DAC cable 1 Pull latch 2 Connector 1 2 ...
Page 92: ...A 12 FigureA 14 Example of a device label ...
Page 104: ...C 6 FigureC 5 Securing the chassis to the pallet base S12504G AF switch 1 1 2 2 1 ...