4-1
4
Installing FRUs
As a best practice, connect power cords after installing all required FRUs. To ensure good ventilation,
install filler panels in unused slots.
Long-time exposure to strong air flow might cause discomfort. To avoid this hazard, do not stand
close to the air outlet vents while the switch is operating. If you must be next to the switch on the air
outlet vent side for an extended period, avoid the air flow or take other protective measures.
TIP:
Keep the chassis and the component packages for future use.
Attaching an ESD wrist strap
The switch is provided with an ESD wrist strap. To minimize ESD damage to electronic components,
wear the ESD wrist strap and make sure it is reliably grounded before you install FRUs.
To attach an ESD wrist strap:
1.
Make sure the switch is reliably grounded. For information about how to ground your switch,
see "Grounding the switch."
2.
Put on the wrist strap.
3.
Tighten the wrist strap to make sure it makes good skin contact.
Make sure the resistance reading between your body and the ground is between 1 and 10
megohms.
4.
As shown in
, insert the ESD wrist strap into the ESD jack on the chassis.
Figure4-1 Attaching an ESD wrist strap (S12508G-AF switch)
Summary of Contents for S12500G-AF Series
Page 32: ...3 15 Figure3 16 Connecting the grounding cable to a grounding strip 1 2 4 3 6 5 ...
Page 49: ...4 16 Figure4 16 Connecting an SFP DAC cable 1 Pull latch 2 Connector 1 2 ...
Page 92: ...A 12 FigureA 14 Example of a device label ...
Page 104: ...C 6 FigureC 5 Securing the chassis to the pallet base S12504G AF switch 1 1 2 2 1 ...