background image

 

Starting application at 0x00100000 ... 

TLB init OK. 

LBC init OK. 

LAW init OK. 

Bsp init start... 

MMU init OK. 

CRC init OK. 

Frame data init OK. 

Connect IRQ 0 OK. 

Enable IRQ 0 OK. 

Connect IRQ 1 OK. 

Enable IRQ 1 OK. 

Connect IRQ 2 OK. 

Enable IRQ 2 OK. 

Connect IRQ 4 OK. 

Enable IRQ 4 OK. 

Connect IRQ 5 OK. 

Enable IRQ 5 OK. 

Connect IRQ 6 OK. 

After the switch completes booting the applications, the following information appears on the terminal 

screen:  

Press ENTER to get started. 

Press 

Enter

 to begin configuring the switch at the prompt:  

<H3C> 

 

 

NOTE: 

 

The S9500E switches provide a command line interface (CLI). For more information about the CLI, see

H3C S9500E Switch Series Fundamentals Configuration Guide. 

 

The output depends on your switch model. 

 

Verification after power-on 

H3C recommends that you check the following conditions after the switch is powered on: 

 

The cooling system is working. You should be able to hear fan rotation noise and feel air being 
blown out.  

 

All the LEDs are functioning properly. 

Table 2

 

LED status when the switch operates properly 

Part LED Name/Color 

Status 

MPU 

MPU status LED 

SFC (green) 

Steady on 

ACT (green) 

 

Active MPU

—Steady on 

 

Standby MPU

—Off 

RUN (green) 

Flashing 

LPU status LED 

RUN (green) 

Flashing 

Summary of Contents for S9500E Series

Page 1: ...a configuration environment 2 Powering on the switch 5 Powering on the switch 5 Verification after power on 7 Connecting the switch to the network 8 Connecting the switch to the network through an AUX...

Page 2: ...ower distribution rack lightning protection box and connector strip etc of the exchange office Long cables can be bound with cable ties Do not bind cables at the air exhaust vent to prevent the cables...

Page 3: ...nnector of the console cable to the serial port of a PC or terminal 2 Connect the RJ 45 connector of the console cable to the console port of the MPU of the switch NOTE When you remove the console cab...

Page 4: ...serial port to be used from the Connect using list and click OK Figure 4 Setting the serial port used by the HyperTerminal connection 4 Set Bits per second to 9600 Data bits to 8 Parity to None Stop b...

Page 5: ...port parameters 5 Select File Properties in the HyperTerminal window Figure 6 HyperTerminal window 6 On the Settings tab set the emulation to VT100 and click OK NOTE H3C recommends that you select th...

Page 6: ...are correctly connected The input power voltage meets the requirement of the switch The console cable is properly connected the terminal or PC used for configuration has started and the configuration...

Page 7: ...layed at the console terminal Board self testing Board steady testing PASS Board SlotNo 0 Subcard exist testing PASS DX246 testing PASS PHY88E1111 testing PASS CPLD1 testing PASS CPLD2 testing PASS NS...

Page 8: ...at the prompt H3C NOTE The S9500E switches provide a command line interface CLI For more information about the CLI see H3C S9500E Switch Series Fundamentals Configuration Guide The output depends on y...

Page 9: ...male connector Plug the RJ 45 connector into the AUX port of the switch and the DB 9 male connector into the DB 9 female port of the modem An AUX cable is the same as a console cable For more informa...

Page 10: ...ng a fiber network facility make sure the type of the connector and the fiber matches the adopted optical port Be sure to install the dust cover if the optical port is not connected to a fiber connect...

Page 11: ...t makes good skin contact and is well grounded 2 Remove the protective cap from the fiber connector and use dust free paper and absolute alcohol to clean the end face of the fiber connector 3 Connect...

Page 12: ...tray optional NOTE The installation method described below is based on an N68 rack The installation procedure is only for your reference if you use a non N68 rack A fiber management tray FMT is insta...

Page 13: ...12 Figure 12 Installing FMTs...

Reviews: