2-11
standard installation holes is slightly smaller than the distance between a standard installation
hole and the middle, auxiliary installation hole.
Figure2-9 Slide rail installation position on the rack
(1) Positioning tab
(2) Bottom square hole in the 2U rack space
2.
Install cage nuts (user-supplied) in the marked mounting holes in the rack posts.
3.
Align the screw holes in one bottom support rail with the installation holes in the rack posts at
one side. Use the user-supplied M6 screws to attach the bottom support rail to the posts, as
shown in
As a best practice, use a torque of 30 kgf-cm (2.94 Nm) to fasten the M6 screws.
4.
Perform the same procedure to attach the other bottom support rail to the rack posts at the
other side.
Make sure the two bottom support rails are at the same height so that the bottom support rails
can slide into the chassis rails steadily.
1 RU
1 RU
1 RU
1 RU
1
2
1
2
Summary of Contents for S9820-8C-SAN
Page 37: ...3 30...