1
Appendix G Cabling recommendations
Routing cables
The cable management brackets are installed on the two sides of the front panel of the gateway. As
a best practice, route cables from the left and right sides of the gateway, as shown in
Figure 1 Routing cables (M9000-AI-E16)
Routing power cords
When you route power cords, take consideration of the layout of the equipment room, including the
locations of the power distribution cabinet, AC power receptacles, and lightning protection box. Place
all re-connecting facilities, such as receptacles, at the rack bottom (Do not place them at a location
out of the rack and easy to reach.)
The power supplies are located at the rear panel of the gateway. As a best practice, route power
cords from the left and right of the rear panel.