background image

 

Figure 9

 

Installing a card 

 

(1) Insert the card into the slot 

(2) Press the ejector levers inward 

(3) Fasten the captive screws 

 

Installing a power module 

 

 

CAUTION: 

Do not install an AC power module and a DC power module on the same gateway. 

 

An AC power module and a DC power module are installed in the same way. This section uses an AC 

power module as an example. For information about AC and DC power modules, see 

H3C SecPath 

M9000 Multi Service Security Gateway Series Installation Guide

Some card slots do not have a blank panel. The figures in this section are for illustration only. 
To install the power module: 

1.

 

Use a Phillips screwdriver to loosen the captive screws on the blank filler panel (if any) to remove 
the blank filler panel. 

2.

 

Unpack the power module. 

3.

 

Follow the installation graph printed on the blank filler panel of the power module to install the 
power module in a correct direction: 

a.

 

Grasp the handle of the module with one hand and support the module bottom with the other.  

b.

 

Push the power module along the guide rails into the slot until it has firm contact with the slot.  
For vertical slot installation, see 

Figure 10

. For horizontal slot installation, see 

Figure 11

4.

 

Press the handle inward until the handle seats into the slot. 

5.

 

Use a Phillips screwdriver to fasten the captive screw on the handle to attach the power module. 

Summary of Contents for SecPath M9000 Series

Page 1: ...H3C SecPath M9000 Multi Service Security Gateway Series Installation Quick Start New H3C Technologies Co Ltd http www h3c com hk Document version 6PW104 20170414...

Page 2: ...her trademarks that may be mentioned in this manual are the property of their respective owners Notice The information in this document is subject to change without notice Every effort has been made i...

Page 3: ...rackets 4 Mounting the gateway to the rack 5 Grounding the gateway 6 Installing FRUs 6 Attaching an ESD preventive wrist strap 6 Installing MPUs LPUs switching fabric modules 7 Installing a power modu...

Page 4: ...he gateways to be installed is no higher than the available installation height of the rack and enough clearance is reserved for cable routing The gateway is ready for installation and has been carrie...

Page 5: ...cage nut 3 Install cage nuts on the square holes on each rack post Figure 2 Installing cage nuts M9006 as an example Installing cable management brackets Cable management brackets signal cable and pow...

Page 6: ...milar procedure For more information see Figure 4 To install a cable management bracket 1 Unpack the cable management brackets 2 Attach the cable management bracket to the chassis and align the screws...

Page 7: ...art of the chassis Installing mounting brackets Marks L and R are printed inside the mounting brackets to distinguish between the left and right mounting brackets To install the mounting brackets face...

Page 8: ...the gateway on the slide rails or rack shelf and slide the gateway along the slide rails until the mounting brackets on the gateway touch the front rack posts The handle of an M9006 is located at the...

Page 9: ...e dual hole terminals of the grounding cable into the grounding holes of the chassis 4 Connect the ring terminal of the grounding cable to the grounding post of the grounding strip and fasten the grou...

Page 10: ...rds in this document These cards are either horizontally oriented or vertically oriented When installing a card in a horizontal slot make sure its PCB faces up When installing a card in a vertical slo...

Page 11: ...on only To install the power module 1 Use a Phillips screwdriver to loosen the captive screws on the blank filler panel if any to remove the blank filler panel 2 Unpack the power module 3 Follow the i...

Page 12: ...G Before you connect the power cable make sure the circuit breaker on the power cable is switched off To connect the power cable 1 Plug the power cable into the power receptacle of the power module 2...

Page 13: ...the power receptacle of the power module 2 Fasten the screw to secure the power cable Figure 13 Connecting the power cable on an M9010 1 Insert the power cable plug into the power module 2 Fasten the...

Page 14: ...s catch in the slot For a QSFP module that uses a plastic pull latch skip this step QSFP modules use either a metal or plastic pull latch They are installed in the same way except that you must pivot...

Page 15: ...en you disconnect the cable first disconnect from the gateway Obtaining documentation To access the most up to date H3C product documentation on the H3C website at www h3c com hk 1 Go to http www h3c...

Reviews: