11
6.
Repeat steps 4 and 5 to install the other slide rail. Make sure the two slide rails are at the same
height so that the gateway can be placed on them horizontally.
Installing cage nuts for attaching mounting brackets
1.
Align the bottom edge of a mounting bracket with the weight-bearing surface of a slide rail.
2.
Determine and mark the cage nut installation holes on the rack post. Each installation hole on
the mounting bracket requires a cage nut.
3.
Install cage nuts on the marked square holes on the front rack post.
4.
Repeat steps 1, 2, and 3 to install cage nuts on another front rack post.
Figure 7 Installing cage nuts on an M9006 gateway
(1) The bottom edge of the mounting bracket aligns with the weight-bearing surface of the slide rail
(2) Install the cage nuts
Attaching cable management brackets and
mounting brackets to the chassis
Before installing the gateway to the rack, install the cable management brackets and mounting
brackets shipped with the gateway. Cable management brackets (signal cable and power cord
management brackets) are used for cabling the gateway, and mounting brackets are used for
attaching the chassis to the rack.
Installing cable management brackets
The M9010 and M9010-GM gateways each have two cable management brackets—the signal cable
management brackets are installed at the upper part of the gateway, and the power cord
management brackets are installed at the lower part of the gateway. They are installed in the same
way. For more information, see
The M9006 and M9014 gateways come with the signal cable management brackets secured to the
mounting brackets. The power cord management bracket of the M9006 gateway has a slightly
different structure than the M9006 and M9014, and is installed in a similar procedure. For more
information, see