Installation Manual
H3C SecPath V100-S Security Gateway
Chapter 3 Installing the SecPath V100-S
3-1
Chapter 3 Installing the SecPath V100-S
3.1 Installation Flow
Start
Install the rack (optional)
Mount the security
gateway
Connect the PGND
Connect the power cord
Connect the security gate-
way to the console terminal
Verify the installation
Power up the security gateway
Troubleshooting
Power down the
security gateway
Verify the installation
Connect the power
cord and power up
Install MIMs (optional)
Turn off the power switch
and remove the power cord
Connect the security gateway
to the Ethernet interface
End
OK?
NO
YES
Figure 3-1
Installation flow