2-1
2
Installing the AP
Installation flowchart
Figure2-1 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Connect the AP to a power source and the network. Examine the LEDs to verify that the AP is
operating correctly. For information about AP LEDs, see "
."
•
Record the MAC address and serial number at the rear of the AP for future use.
•
Make sure you have completed cabling at the installation site.
Determining the installation position
Determine the installation position by observing the following principles:
•
Few obstacles such as wall exist between the AP and clients.
•
The AP is far away from electronic devices (such as microwave oven) that might generate
radio frequency (RF) noise.
•
The AP does not hinder people’s daily work and life.
Start
Complete pre-installation tasks
Determine
the mounting option
On the wall
On the ceiling
Connect the AP to the power
source
Connect the AP to the network
End
Install the AP