background image

Maintenance

work

GB

6

4. Maintenance work

WARNING

Before starting any cleaning work, the stove must be cool down! The mains plug must be pulled out of
the power supply socket (always in advance)!

WARNING

Devices that are not maintained in accordance with our specifications must not be operated. Failure to
observe this point will invalidate all guarantee claims.

4.1. Cleaning of the ash pan - once a week

WARNING

The frequency of maintenance in turn depends to a large extent on the pellet quality (ash content). Quality
pellets have a low ash content of about 0.2-0.3%. However, if the ash content is higher (0.5% and over), the
interval from maintenance to maintenance is reduced and the accumulation of ash increases by 2 or 3 times.

Summary of Contents for HSP 6 537.08-WT RLU/PGI

Page 1: ...HSP 6 537 08 WT RLU PGI Equipment sheet Pellet stove with heat exchanger GB 0553708001403b Equipment sheet HSP 6 537 08 WT RLU PGI...

Page 2: ...he heating device or of an injury The note entitled Notice advises you on possible damage to your heating device The note entitled Important calls your attention to the information important for the o...

Page 3: ...tenance work 6 4 1 Cleaning of the ash pan once a week 6 4 2 Cleaning of the exchanger once a week 8 4 2 1 Vertical cleaning of the exchanger 8 4 2 2 Horizontal cleaning of the conduits of combustion...

Page 4: ......

Page 5: ...f storage container pellet tank about 32 kg Duration of burn with one charge min max about 15 h 60 h Permitted fuel Low dust wood pellets diameter 6 mm to Norm M 7135 DIN plus EN plus A1 length max 30...

Page 6: ...Dimensions GB 2 2 Dimensions 2 1 Dimensions...

Page 7: ...nnection of the exchanger Item Name A Heating water output outside thread G3 4 B Return water intake outside thread G3 4 C Outlet of the safety valve outside thread G1 2 D Filling of the circulation s...

Page 8: ...stion chamber function instruction Error F040 The whole combustion space must be cleaned after 30 hours operation at the latest or once a week The requirement to clean the fire box flickering of the d...

Page 9: ...ring in the pellet tank might possibly result This will destroy your device and is not covered in your guarantee WARNING Cleaning the combustion pot may only be done with a cooled down stove in OFF op...

Page 10: ...fications must not be operated Failure to observe this point will invalidate all guarantee claims 4 1 Cleaning of the ash pan once a week WARNING The frequency of maintenance in turn depends to a larg...

Page 11: ...Maintenance work GB 7 Figure 1...

Page 12: ...to clean the conduits of combustion products and the exchanger once in a week Please perform the short time cleaning in two steps 4 2 1 Vertical cleaning of the exchanger For the purposes of vertical...

Page 13: ...cleaning bar from the rear cover of the stove Next remove the cover plug and dismount the screw M10x70 by means of an Allen wrench located behind the ash pan door After having finished the cleaning by...

Page 14: ...Maintenance work GB 10 Figure 3a...

Page 15: ...Maintenance work GB 11 Figure 3b...

Page 16: ...ce work GB 12 Figure 3c Pos Description Piece No PR 1 Cover plug 1 piece 0553808006180 2 Allen wrench 6mm 1 piece 9001700060005 3 Screw M10x70 1 piece 0030121000705 4 Drawbar of cleaning 1 piece 04333...

Page 17: ...s ducts at the latest after 1000 kg of pellets have been consumed Clean with a brush or an ash extractor CAUTION After completion of the cleaning make sure that when putting back the covers the seals...

Page 18: ...Maintenance work GB 14 Figure 4...

Page 19: ...Maintenance work GB 15 Figure 5 Removing the side wall...

Page 20: ...1 in the pellet tank may be removed Then clean the tank and the intake of the screw conveyor housing with a vacuum cleaner After cleaning it is essential to put back the protective grille When doing...

Page 21: ...Replacement parts list GB 17 5 Replacement parts list 5 1 Replacement parts list HSP 6 537 08 WT RLU PGI without trim parts...

Page 22: ...e ri anthracite 2 piece 0553808005042 12 Combustion chamber cladding right 1 piece 0553808005039 13 Conecting pipe 3 4 L 670 1 piece 0553808005903 14 Hose Meniflex L 300 1 piece 0553808005315 15 Room...

Page 23: ...5202 40 Outlets of the hydraulic system cock Ms Cross inserts set 1 piece 0088600000055 41 OC 2 piece 0089500080005 42 Flue gas thermosensor 1 piece 0561008005540 43 Conecting pipe L 550 1 piece 05538...

Page 24: ...cite set 1 piece 0553808005340 A1 3 Glass holder black set 1 piece 0551908035308 A1 3 Glass holder anthracite set 1 piece 0551908005308 52 Combustion chamber door black 1 piece 0541908007220 52 Combus...

Page 25: ...piece 0553808006140 56 58 Side wall left right white 2 piece 0553808016140 57 Front plate anthracite 1 piece 0553808016120 57 Front plate anthracite black 1 piece 0553808006120 59 Cover plate anthraci...

Page 26: ...Circuit diagram GB 22 6 Circuit diagram Circuit diagram IO 33 6...

Page 27: ...7 38 Flame temperature sensor 39 40 Room temperature sensor 41 42 Bottom flame temperature sensor TFL 2 43 44 Door contact switch 46 47 Temperature sensor on the input 48 50 Flue gas fan rotation spee...

Page 28: ......

Reviews: