96-0012 rev G
5
June 2003
O
M
PERATOR’S
ANUAL
A u t o m a t i c
A u t o m a t i c
A u t o m a t i c
A u t o m a t i c
P a l l e t C h a n g e r
P a l l e t C h a n g e r
INSTALLATION
3.0 INSTALLATION
TOOLS REQUIRED:
•
Machinists' level (2)
•
Forklift capable of lifting 5,000 lbs, with forks at least 6' long
•
6' straightedge
•
Included -
APC chain rotation tool (P/N 20-0102)
•
Allen wrenches
•
Included -
APC jumper
Prior to installing your VMC, make certain that there is enough floor space on the right-hand side of the VMC to
place the APC. The APC will add approximately 52
1
/
2
" (58
1
/
2
" for the VF-4) to the width of the VMC. Ensure
that all the air and power requirements for the VMC have been met.
G
ENERAL
R
EQUIREMENTS
Operating Temperature Range
41°F to 104°F (5 to 40°C)
Storage Temperature Range
-4°F to 158°F (-20 to 70°C)
Ambient Humidity: less than 90% relative humidity, non-condensing
Altitude: 0-7000 ft.
3.1 VF/APC F
OOTPRINT
VF 3/4 WITH APC FOOTPRINT