Remove Shipping Brackets
1
Remove three bolts [1] that secure the B axis
body [2] to the spindle head shipping bracket [3].
Remove four bolts [4] that secure the spindle
head shipping bracket to the table and remove
the shipping bracket from the machine.
Install the plugs [5] into the shipping bracket
mounting holes on the B-axis body.
2
To unblock Y axis:
• Remove the Y axis shipping bolts [1]
that secure the Z axis sub plate [2] to
the bridge.
To unblock X axis:
• Remove two bolts [3] that secure the X
axis shipping bracket [5] to the gantry
column.
• Remove two bolts [4] that secure the X
axis shipping bracket [5] to the table.
• Remove the shipping bracket [5].
• Reinstall the table bolts [4].
• Perform the same steps to remove the
shipping bracket [6] on the other side of
the gantry.
GM-2-5AX - Installation Guide
Page 10 of 15 pages