ES0755 rev A 1/11
32
To
TSC
Filter
Standard
Pump
TSC
Pump
Gate
Filter
Standard Filtration Setup
To
Spindle
Head
From TSC
Pump (1)
Gate Filter
To TSC
Pump (2)
1
2
To TSC
Filter
2. Connect the hose attached to the spindle head to the hose connection on the Standard Coolant Pump.
3. Separate the hoses coming from the Auxiliary Filter. They have been connected together for shipping.
4. Attach the Auxiliary Filter male connector (top hose) to female connector on the TSC Coolant Pump Assem-
bly (Items labeled “1” in the previous illustration).
5. Attach the Auxiliary Filter female connector (bottom hose) to the short hose with the male connector on the
TSC Coolant Pump Assembly (Items labeled “2” in the previous illustration).
6. Connect the plastic tubing (shipped tied to the Auxiliary Filter) from the small elbow fitting on the top of the
Auxiliary Filter to the small elbow fitting on the Standard Coolant Pump hose connector.
7. Connect the hose attached to the TSC Coolant Pump Assembly to the TSC Filter Assembly.
8. Check that the filter lid is securely closed.
9. Run primary coolant system for ten minutes to prime the bag filter housing before using the TSC system.
1000 P
si
t
hrouGh
the
s
Pindle
c
oolant
i
nstallation
Place the 1000psi TSC assembly next to the coolant tank behind the machine with the hose connections
facing the back of the machine. Use the following coolant schematic as an aid for hose routing.
TSC
CC
TO MACHINE
BYPASS HOSE TO COOLANT TANK
CIA
COOLANT INTAKE ASSEMBLY
AF
AF TANK ASSEMBLY
CP
COVER PLATE
GA
SUCTION GAGE, INTAKE FILTER
P/AFA COOLANT PUMP & TANK ASSEMBLY
COOLANT
TANK
INTAKE
HOSE
CIA
CP
GA
AF
P/AFA
RA
CC
CONTROL CABINET
RA
PRESSURE REGULATOR
TSC CABLE
FROM J-BOX
PA
PA
COOLANT PUMP
MTR
MTR
STANDARD COOLANT MOTOR
TUBE
PRIMING
COOLANT
FLOW
1. Connect the power cable for the pump assembly to an external source in order to power the motor. Note
that the CNC control does not provide power to the pump motor. Customer supplied external power must be
supplied at the time of installation. The power required is 208-230 volt 3-phase 50/60Hz, and have a 20-amp
circuit breaker. The pump assembly is pre-wired with a NEMA L15-20 plug.
The pump assembly can also use an alternate power source, these are: