4

MA 5103 b-UK

MA 5103 b-UK

Teile-Nr. 01/0117000

5. Regular inspections 

According to the German Ordinance on Industrial Health and Safety (BetrSichV), the operating company must speci-
fy inspection intervals on the basis of a risk assessment. The inspection must be performed by a qualified person. 
Checklists for documenting the inspection can be downloaded at www.haca.com.

 

 
6. Standards and regulations 
DIN 18799-1

Fixed ladders for construction works - Ladders with two uprights, 

                          

safety requirements and tests

  

DIN 18799-2

Fixed ladders for construction works with centre rail, 

                          

safety requirements and tests

  

DIN EN ISO 14122-4

Permanent means of access to machinery

 

DIN 14094-1

Escape ladder installations

 

DIN EN 14396

Fixed ladders for manholes 

DIN EN 353-1

Personal fall protection equipment

 

DIN EN 361

Personal fall protection equipment – Full body harnesses ArbStättV 

ArbStättV

German regulations governing the workplace 

BetrSichV

German Ordinance on Industrial Health and Safety

 

3. Use 

To unfold the platform, first climb one rung higher on the ladder than the rung that the platform is atta-
ched to. Then with a sideways movement of the tip of your foot, fold the platform forwards so that it rests 
on the ladder rung. Fold the second platform section forward in the same way. The platform is now in wor-
king position. After use, lift the platform with the tip of your foot and fold it backwards.

 

 
 
 
4. Distances between rest platforms according to standards and the effective length of the  
    ladder systems 

* A rest platform provides space for more than one person. 
A rest platform is only necessary if the vertical ladder system is climbed by more than one person. 
** When used only by trained employees ≤ 25 m

Summary of Contents for 0529.1913

Page 1: ...fixed HACA two rail ladders as well as on all fixed HACA single rail ladders 2 Assembly The assembly can be carried out on any rung of the lad der Depending on the version the assembly accessories include special HACA nuts with a grip coating For identifi cation purposes these should be mounted so that the blue coating can be seen from the outside A tightening torque of 35 Nm applies to all screw ...

Page 2: ...nd through the elongated holes Fig 1 3 5 Cy linder screws are used in the upper holes and bracket screws in the lower holes When using a fall arrest rail the counter plate is not mounted Fig 4 5a The spacer sleeves must al ways be selected 1 mm smaller than the rung width The rest platform is now screwed in place by using the washers and nuts supplied The rest platform must be aligned so that the ...

Page 3: ... behind Fig 9 The rest platform must be aligned in such a way that the foot rests are horizontal 2 2 Assembly on aluminium single rail ladders Rest platform model 0643 1913 Insert the supplied T bolts from the front through the holes Fig 1 Insert a washer from behind and screw on a nut The thread should protrude far enough from the nut in order that it can be gripped Stop the folding rest platform...

Page 4: ...EN 14396 Fixed ladders for manholes DIN EN 353 1 Personal fall protection equipment DIN EN 361 Personal fall protection equipment Full body harnesses ArbStättV ArbStättV German regulations governing the workplace BetrSichV German Ordinance on Industrial Health and Safety 3 Use To unfold the platform first climb one rung higher on the ladder than the rung that the platform is atta ched to Then with...