background image

 

 

 

 

 

 

5.52.695.00.01.04 

 

 

NOTICE!

 

The installation or mounting instructions for incomplete 

machines you’ll find in chapter <Installation=

 

 

 

 by Heinrich de Fries GmbH 

Heinrich de Fries GmbH, Gauss Str. 20, D-40235 Düsseldorf 

 

Heinrich De Fries GmbH will be named HADEF in the following text. 
Original operating- and maintenance instructions in German language. 
Translation in other languages is made of the German original.  
A copy may be requested in writing or is available for download o

www.hadef.com

  

Subject to changes. 
 

 

Table of Contents 

1

 

Information .......................................................................................... 3

 

2

 

Safety ................................................................................................... 3

 

2.1

 

Warning notice and symbols ............................................................................................ 3

 

2.2

 

Duty of care of the owner .................................................................................................. 3

 

2.3

 

Requirements for the operating personnel ..................................................................... 4

 

2.4

 

Appropriate use ................................................................................................................. 4

 

2.5

 

Basic safety measures ...................................................................................................... 5

 

3

 

Transport and Storage ....................................................................... 5

 

3.1

 

Transport ............................................................................................................................ 5

 

3.2

 

Safety device for transport ............................................................................................... 6

 

3.3

 

Storage ............................................................................................................................... 6

 

4

 

Description .......................................................................................... 6

 

4.1

 

Areas of application .......................................................................................................... 6

 

4.2

 

Design ................................................................................................................................. 6

 

4.3

 

Functions ............................................................................................................................ 6

 

4.4

 

Important components ...................................................................................................... 7

 

5

 

Technical data ..................................................................................... 7

 

6

 

Installation ........................................................................................... 7

 

6.1

 

Trolley ................................................................................................................................. 7

 

6.2

 

Adjusting the gauge .......................................................................................................... 7

 

6.3

 

Installation on the beam .................................................................................................... 8

 

7

 

Control ................................................................................................. 8

 

8

 

Commissioning ................................................................................... 9

 

8.1

 

General ............................................................................................................................... 9

 

9

 

Safety check ........................................................................................ 9

 

10

 

Functional test .................................................................................... 9

 

10.1

 

Checks before the initial start-up ..................................................................................... 9

 

10.2

 

Functional test ................................................................................................................... 9

 

11

 

Maintenance ........................................................................................ 9

 

11.1

 

General ............................................................................................................................... 9

 

11.2

 

Monitoring .......................................................................................................................... 9

 

12

 

Inspection .......................................................................................... 10

 

12.1

 

Periodic checks ............................................................................................................... 10

 

Summary of Contents for 208/05

Page 1: ...695 00 01 04 Monorail Trolleys as monorail push travel trolley 208 05 as monorail hand geared trolley 209 05 with threaded bold G 208 05 209 05 208 05G 209 05G Installation Operating and Maintenance I...

Page 2: ...1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 3 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transpor...

Page 3: ...tanding and can be different from the real design NOTICE We refer to the prescribed equipment tests before initial start up before putting back into operation and the regular periodic inspections In o...

Page 4: ...gularly trained in all applicable matters regarding safety at work and environmental protection and that they are familiar with the operating manual and in particular the safety instructions it contai...

Page 5: ...ntion to the national regulations that apply Building walls ceilings floors or constructions on which the units are mounted or suspended must be checked by a structural engineer for sufficient stabili...

Page 6: ...of condensation NOTICE Use only in the intended atmosphere with a humidity of up to 100 but not under water DANGER In particular use is not permitted for tearing loose fixed loads dragging of loads as...

Page 7: ...ther end of the track This must be attached so that any elastic limitation buffer or the trolley wheels are driven against them in their end position when moving Generally additional lifting gear e g...

Page 8: ...ar 5 Pull apart the side plates 1 as far until it is possible to push the trolley onto the beam flange from below Afterwards push the trolley together to correct gauge 6 Secure the washers 6 and dista...

Page 9: ...her prescriptions and technical regulations This person must test the material for one s work regularly with regard to design and kind of use The license will be given to qualified person be the appro...

Page 10: ...fracoat 99113 Chain lubricant OKS 451 13 2 Lubricant for food industry Selection as option SHELL MOBIL CASTROL KL BER Gearing FM Grease HD2 Mobilgrease FM 222 Kl beroil 4UH 1 1500 N Load chain Lubrica...

Page 11: ...ecommissioning leaving plenty of space Read the chapter Safety instructions Disassembly is carried out in reverse order to the assembly Please make sure that all operating material is disposed of in a...

Reviews: