Operation 

 

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their 
operation. They must be authorized by the employer for the operation of the equipment. The employer must 
ensure that the operating instructions are available near the equipment and that they are accessible for the 
operating personnel.  

 

Lifting and Lowering by pulling the endless hand 
chain. 

 

Lifting - pull the chain fall at the right side 

–  

the hand chain wheel turns clockwise 

 

Lowering - pull the chain fall at the lift side 

–  

the hand chain wheel turns anti-clockwise 

 

Illustration5 

 

 

  

NOTICE!

 

For double lifting mechanism 

Operate both lifting mechanism, synchronous resp.evenly. 

 

 

 

   

CAUTION!

 

Run in of chain into the chain container for hoist with double lifting mechanism 

For a correct run in of chain into both chain containers, the lowering operation must be carried out, without 
load, at certain intervals, until both chain container are empty. 

 

For motorized devices with operating limit switches "lowering" 

Lower until the operating limit switch is released. 

 

Non-observance can lead to device damages! 

 

 

   

WARNING!

 

The hoist must always hang centrally under the beam or under its suspension point. 

 

 

Monorail push travel trolleys are moved by pushing the load. 

Monorail hand geared trolleys are moved by pulling the hand chain. 

 

 

 

7.1 

Brake and pawl  

The brake system needs a minimum load of 3% of the capacity. 

Only  this  minimum  load  makes  sure  that  the  load-pressure-brake  closes  correctly.  When  the  brake  closes 
correctly, the load is safely held 

   

GEFAHR!

 

Working situations with no guarantee that the minimum load is charged, are forbidden! 

 

 

Commissioning 

 

8.1 

General 

Should the unit be used in Germany:  

Please observe the validated, national accident prevention regulations. 

For other countries:  

Inspections as above. Please observe the national rules and regulations and the instructions in this manual! 

 

 

Summary of Contents for 21/12

Page 1: ...5 52 162 00 01 05 Rev 05 HADEF Spur Gear Chain Hoist Type 21 12 with monorail push travel trolley HR with monorail hand geared trolley HH Installation Operating and Maintenance Instructions...

Page 2: ...nges Table of Contents 1 Information 3 2 Safety 4 2 1 Warning notice and symbols 4 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 5 2 4 Appropriate use 5 2 5 Basic safety...

Page 3: ...to a certified quality assurance system as per ISO 9001 The production of components at our work is subject to strict intermediate checks After assembly each product is subject to a final test with ov...

Page 4: ...or they must be suitable for use in area prone to explosion The owner is responsible for this However in everyday operation this degree of safety can only be achieved if all measures required are take...

Page 5: ...iginal spare parts must be used Non compliance will result in any warranty claims becoming void Liability and warranty will become void if unauthorized modifications of the units are made by the user...

Page 6: ...wisted chains must be aligned before attaching the load The correct alignment of the chain links can be seen from the weld seams The chain links must always be aligned in one direction Don t bump agai...

Page 7: ...the unit in an area at risk from explosion 4 2 Design HADEF Spur Gear Hoists of compact design are monorail trolleys combined with manual hoists With monorail push travel trolley or with monorail han...

Page 8: ...ain falls 1 1 1 1 2 2 Load chain mm 5 x 15 6 3 x 19 1 7 1 x 21 8 x 24 7 1 x 21 9 x 27 Load bar size at beam flange width from to 1N mm 50 146 50 179 66 185 66 185 74 196 74 192 Load bar size at beam f...

Page 9: ...to adjust the beam flange width dismantle the safety screws 3 at one trolley side After adjustment of dimension X and installation on the beam install the safety screws 3 again and secure them with a...

Page 10: ...s the lowering operation must be carried out without load at certain intervals until both chain container are empty For motorized devices with operating limit switches lowering Lower until the operati...

Page 11: ...uthorities Z S 8 2 Load chain Before commissioning the load chain must be aligned and oiled For the first commissioning of motorized hoists chain oil is supplied with the delivery Move safety note and...

Page 12: ...insert new chains in an unloaded state and as the chains that are currently in the device i e not twisted Remove chain from its fastening at the end and attach a chain link which is open at the side...

Page 13: ...the table or if cracks or corrosion are found the parts must be replaced with original spare parts 12 2 Checking the load chain CAUTION The load chain must be tested over its entire length The measur...

Page 14: ...hen the dimension of hook opening width is deformed more than 10 or when the dimension of the hook bottom thickness is fallen short of by 5 due to wear the hook must be replaced 12 4 Checking pawl A V...

Page 15: ...e chain If there are environmental influences that foster wear such as sand a dry lubricant should be used e g graphite powder When lubricating the chain s condition of wear should be checked CAUTION...

Page 16: ...OBIL CASTROL KL BER Gearing FM Grease HD2 Mobilgrease FM 222 Kl beroil 4UH 1 1500 N Load chain Lubricant FM 100 Optimol Viscoleb 1500 Load hook Pulleys Gear rim Drive pinion FM Grease HD2 Mobilgrease...

Page 17: ...housing and got stuck there Release the hook suspend the load again lower the load unload the hoist Hoist does not lower the load Brake too tight Lift the brake Brake too tight due to rust Replace ru...

Reviews: