Maintenance 

 

 

11.1 

General 

All  monitoring,  servicing  and  maintenance  operations  are  to  ensure  correct  functioning  of  the  equipment; 
they must be effected with utmost care. 

  Only 

“qualified persons” may do this work. 

  Servicing and maintenance work must only be done when the hoist is not loaded. 

  Records must be kept of all test results and measures taken. 

 

11.2 

Monitoring 

The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift 
operation.  In  case  of  severe  operating  conditions  (e.g.  frequent  operation  with  full  load)  or  special 
environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly  

 

 

11.3 

Replacing the load chain 

   

CAUTION!

 

If  there  is  any  visible  damage  and  when  the  conditions  for  replacement  are  reached  (i.e.  one  or  several 
dimensions in the table have been reached, there is corrosion or elongation), the chain must be replaced.  

When replacing the chain, also check the chain wheels. 

Procedure: 

  Only insert new chains in an unloaded state and as the chains that are currently in the device 

– i.e. not 

twisted. 

  Remove chain from its fastening at the end and attach a chain link which is open at the side. 

  A chain link which is open at the side, can 

easily be produced by grinding out a small 
piece. The opening must have the same 
thickness as the chain link. 

 

Illustration 6 

 

  Hang a new original chain (same size and oiled) in the side opened chain link and insert it. 

  Make sure the chain is not installed twisted. 

  Make sure the chain links are aligned in one direction. 

  Assemble the chain to the end fastening. 

 

12 

Inspection 

 

 

12.1 

Periodic checks 

Independently from the regulations of the individual countries, lifting devices must be checked at least yearly 
by a qualified person or licensed qualified person regarding its functional safety.  

 

12.1.1 

Components to be checked 

The following must be checked: 

  Dimensions of load chain, load hooks, pawls, bolts, ratchet wheels, brake linings. 

 

The dimensions must be compared to the dimensions in the tables. 

  A visual inspection for deformations, cracks and corrosion must be carried out. 

 

   

CAUTION!

 

When the wear limit is reached, the part must be exchanged by a new, original part. 

 

 

 

Summary of Contents for 21/12

Page 1: ...5 52 162 00 01 05 Rev 05 HADEF Spur Gear Chain Hoist Type 21 12 with monorail push travel trolley HR with monorail hand geared trolley HH Installation Operating and Maintenance Instructions...

Page 2: ...nges Table of Contents 1 Information 3 2 Safety 4 2 1 Warning notice and symbols 4 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 5 2 4 Appropriate use 5 2 5 Basic safety...

Page 3: ...to a certified quality assurance system as per ISO 9001 The production of components at our work is subject to strict intermediate checks After assembly each product is subject to a final test with ov...

Page 4: ...or they must be suitable for use in area prone to explosion The owner is responsible for this However in everyday operation this degree of safety can only be achieved if all measures required are take...

Page 5: ...iginal spare parts must be used Non compliance will result in any warranty claims becoming void Liability and warranty will become void if unauthorized modifications of the units are made by the user...

Page 6: ...wisted chains must be aligned before attaching the load The correct alignment of the chain links can be seen from the weld seams The chain links must always be aligned in one direction Don t bump agai...

Page 7: ...the unit in an area at risk from explosion 4 2 Design HADEF Spur Gear Hoists of compact design are monorail trolleys combined with manual hoists With monorail push travel trolley or with monorail han...

Page 8: ...ain falls 1 1 1 1 2 2 Load chain mm 5 x 15 6 3 x 19 1 7 1 x 21 8 x 24 7 1 x 21 9 x 27 Load bar size at beam flange width from to 1N mm 50 146 50 179 66 185 66 185 74 196 74 192 Load bar size at beam f...

Page 9: ...to adjust the beam flange width dismantle the safety screws 3 at one trolley side After adjustment of dimension X and installation on the beam install the safety screws 3 again and secure them with a...

Page 10: ...s the lowering operation must be carried out without load at certain intervals until both chain container are empty For motorized devices with operating limit switches lowering Lower until the operati...

Page 11: ...uthorities Z S 8 2 Load chain Before commissioning the load chain must be aligned and oiled For the first commissioning of motorized hoists chain oil is supplied with the delivery Move safety note and...

Page 12: ...insert new chains in an unloaded state and as the chains that are currently in the device i e not twisted Remove chain from its fastening at the end and attach a chain link which is open at the side...

Page 13: ...the table or if cracks or corrosion are found the parts must be replaced with original spare parts 12 2 Checking the load chain CAUTION The load chain must be tested over its entire length The measur...

Page 14: ...hen the dimension of hook opening width is deformed more than 10 or when the dimension of the hook bottom thickness is fallen short of by 5 due to wear the hook must be replaced 12 4 Checking pawl A V...

Page 15: ...e chain If there are environmental influences that foster wear such as sand a dry lubricant should be used e g graphite powder When lubricating the chain s condition of wear should be checked CAUTION...

Page 16: ...OBIL CASTROL KL BER Gearing FM Grease HD2 Mobilgrease FM 222 Kl beroil 4UH 1 1500 N Load chain Lubricant FM 100 Optimol Viscoleb 1500 Load hook Pulleys Gear rim Drive pinion FM Grease HD2 Mobilgrease...

Page 17: ...housing and got stuck there Release the hook suspend the load again lower the load unload the hoist Hoist does not lower the load Brake too tight Lift the brake Brake too tight due to rust Replace ru...

Reviews: