Commissioning
16
5.52.800.00.01.00
8 Commissioning
Pos: 12.2.1.1 /1_HADEF/9--INBETRIEBNAHME/Allgemein/Allgemein/01.Allgemein @ 0\mod_1172504961658_52.docx @ 355 @ @ 1
8.1 General
Should the unit be used in Germany, please observe the accident prevention regulations, in particular BGV
D8, BGV D 6 and BGR 500 (VBG 9a).
For other countries: Inspections as above. Please observe the national rules and regulations and the
instructions in this manual!
Pos: 12.2.1.2 /1_HADEF/---ALLGEMEIN/Hinweise/Prüfungen/HINWEIS - Prüfung durch befähigte Pesonen @ 0\mod_1177339966681_52.docx @ 5319 @ @ 1
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a “qualified
person” before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a “licensed qualified person” before putting in operation.
An exception is “hoists ready for operation” acc. To BGV D6 II§25(4) with EU-declaration of conformity.
Definition “qualified person” (former expert)
A “qualified person” has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one’s work.
Definition “licensed qualified person” (former approved expert)
A “licensed qualified person” has, due through special occupational training, knowledge about testing of the
material for one’s work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one’s work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
Pos: 12.2.2 /1_HADEF/---ALLGEMEIN/Hinweise/Prüfungen/HINWEIS - Vorgeschriebene Prüfungen @ 0\mod_1174472067892_52.docx @ 821 @ @ 1
NOTICE!
We refer to the prescribed equipment tests before initial start-up, before putting back into operation and the
regular periodic inspections.
In other countries any additional national regulations must be observed.
Pos: 13.1 /1_HADEF/10-SICHERHEITSPRÜFUNG/*Ü1*/#. Kapitel - Sicherheitsprüfung @ 0\mod_1172647514342_52.docx @ 401 @ @ 1