17
OPERATION MANUAL
For optimum performance from the machine, it is important that the machine is well cleaned
and maintain. Follow the maintenance schedule listed in the following section and refer to any
specific instructions given.
Before maintaining or cleaning the machine, turn off the circuit
breaker, or disconnect the machine from the power supply.
Post a sign to inform other workers that the machine is under maintenance.
6. MAINTENANCE
6.1 SCHEDULE
Daily Check
• Loose mounting bolts.
• Worn or damaged wires.
• Check/adjust lubrication.
• Any other unsafe condition
• Inspect the belt for damage or excessive use.
Cleaning
Cleaning the machine is relatively easy. Wipe down all unpainted and machined surfaces daily
to keep them rust free and in top condition. This includes any surface that is vulnerable to rust if
left unprotected. Use ISO 68 machine oil or any other quality metal lubricant.
Normal maintenance of the contact wheel and the steering roller is needed.
The outside cover of the belt, and the grinding remnants and dust in the outlet ports should be
frequently cleaned and kept clean to resist build up.
6.2 OPTIONAL ACCESSORIES
Replacement Belts for BS-76
40G Zirconia Linishing Belt Pack
(Order Code A8079)
60G Zirconia Linishing Belt Pack
(Order Code A8080)
80G Zirconia Linishing Belt Pack
(Order Code A8081)
100G Zirconia Linishing Belt Pack
(Order Code A8082)
120G Zirconia Linishing Belt Pack
(Order Code A8083)
Replacement Belts for BS-152
40G Zirconia Linishing Belt Pack
(Order Code A8090)
60G Zirconia Linishing Belt Pack
(Order Code A8091)
80G Zirconia Linishing Belt Pack
(Order Code A8092)
100G Zirconia Linishing Belt Pack
(Order Code A8093)