background image

31

Mounting and Brief Operating Instructions

E

n

g

lis

h

Dialock Cylinder DC - Status: 09.2003 - 732.29.140

RESET

Note: It is only possible to execute RESET from inside.

1. Unscrew the two grub screws (7) and pull off the inner knob (10).

2. Using metal tweezers or the reset tool, bridge pins 1 and 2. The

RESET process is described below.

3. Following the reset, replace the inner knob (10) and screw it into place

with the three grub screws (7).

RESET process:

When the reset contact points (A) are bridged and the Dialock DC Cylin-
der is switched on, both the LEDs in the panel light up.

After 1 second, the red LED starts to flash. It goes off altogether after
another 3 secs.

Total RESET (long RESET):

If the bridge is closed for more than 4 secs. a total reset is carried out. All
configuration data are returned to their basic settings and all data (includ-
ing user data) are cancelled.

- Release the bridge 

after

the red LED has stopped flashing.

Simple RESET (short RESET):

If the bridge is closed for more than 1 sec. but less than 4 secs. a simple
reset is carried out. Only the project code is reset.

- Release the bridge 

before

red LED stops flashing.

A

Summary of Contents for Dialock Cylinder DC

Page 1: ...Dialock Zylinder DC Dialock Cylinder DC GB D Montage und Kurzanleitung Mounting and Brief Operating Instructions ...

Page 2: ...r DC Status 09 2003 732 29 140 Contents Scope of delivery 16 Area of application 17 Conditions for installation 17 Instructions for installation 18 Commissioning 22 Brief operating instructions 23 Operation 24 Replacement of batteries 25 Emergency opening 26 RESET 27 17 ...

Page 3: ... lithium batteries art no 560 0004 03000 8 Forend 11 O ring 2 for front cover 1 Grub screws 7 Contact bridge 9 Optional Instructions for Installation and Operation with Allen key 2 mm and 0 9 mm 1 Front cover 2 O ring 3 Knob screw Allen screw 4 Outer knob 5 Connection wire 6 Cylinder 7 Grub screws 8 Batteries 9 Contact bridge 10 Inner knob 11 Forend 12 Mortise lock ...

Page 4: ...tions for installation Important To install the Dialock DC Cylinder use only a cylinder of the correct inner and outer length distance A and B When measuring the cylin der lengths the height of the inner and outer lock rosettes must be taken into account The dimensions A and B are important when ordering A outer dimension mm distance between the outer edge of the inner rosette and the centre of th...

Page 5: ... Dialock DC Cylinder is already greased by the manufac ture Further lubrication is not required 1 Using a suitable tool release the front cover 1 from the outer knob 4 and carefully pull it out The front cover 1 is secured against twisting by means of a groove Important Take care not to damage the connection wire 5 2 Using the Allen key unscrew the two screws 3 inside the outer knob 4 and remove t...

Page 6: ...lock 12 4 Tighten the cylinder 6 with the forend 11 Check that the catch turns smoothly when the inner knob 10 is turned 5 Push the connection wire 5 through the slot in the outer knob 6 Push the front cover 4 onto the outside of the cylinder 6 and screw the two screws 3 hand tight using the Allen key Important When pushing into position the outer knob 4 must not be twisted otherwise the connectio...

Page 7: ...of the connection wire 5 into the terminal A When pushing into the non insulated cable side silvery must be visible Do not use force The locking device is open manu facturer s setting The connection wire 5 can be ins erted If the locking is closed it is not possi ble to insert the connecting cable In this case the locking device must first be pulled carefully out A 5 B 1 ...

Page 8: ...23 Mounting and Brief Operating Instructions English Dialock Cylinder DC Status 09 2003 732 29 140 1 2 3 4 5 6 silvery ...

Page 9: ...9 140 The connecting cable is correctly inserted and the locking device is correctly closed 9 Press the front cover 1 onto the outer knob 4 Important observe the correct position of the groove twist guard Take care not to kink or damage the connection wire The outer knob is now fully installed ...

Page 10: ...e they are inserted correctly 11 Push the contact bridge 9 into position 12 Place the inner cover 10 in position and using the Allen key screw the three grub screws 7 hand tight The inner knob is now fully installed 13 Function test press the white button on the panel The LED panel flashes green 5 times and then red 5 times first use only ...

Page 11: ...ds 3 While the green LED is still flashing hold the green programming key in front of the panel If the teaching operating is successful the green LED lights up for a moment and then the red LED begins to flash 4 While the red LED is still flashing hold the red cancelling key in front of the panel If the teaching operating is successful the green LED lights up and then the electronics switch off 5 ...

Page 12: ...he user key to be taught in front of the panel within 5 secs The green LED lights up for a moment Locking rights have now been assigned to this user key 4 Remove the first user key Hold the user key to be taught in front of the panel within 5 secs If no further user key is held in front of the panel The Dialock DC Cylinder switches off automatically Withdrawing rights to user key 1 Press the white...

Page 13: ...nt of the panel The red LED flashes 3 Hold the green programming key in front of the panel The red LED lights up for a moment All locking rights have now been withdrawn Operation 1 Press the white button on the panel The red LED lights up 2 Hold the user key in front of the panel 3 The Dialock DC Cylinder can be opened within 3 secs Turn the outer knob to open the lock If the LEDs do not switch fr...

Page 14: ...r will only function correctly when exhausted batteries are replaced immediately 1 Unscrew the three grub screws 7 and pull off the inner knob 10 2 Remove the contact bridge 3 Insert the new batteries Ensure they are inserted the right way round 4 Push the contact bridge 9 back into position 5 Place the inner knob 10 in position and using the Allen key screw the three grub screws 7 hand tight 6 Fu...

Page 15: ...ase the front cover 1 from the outer knob 4 and pull it carefully off Important Take care not to damage the connection cable 5 2 Push the cable for the emergency power supply onto the emergency power terminal A of the aerial board The electronics switch on auto matically 3 Hold the authorised key in front of the panel 4 The Dialock DC Cylinder is ready Turn the outer knob to open the lock 5 Discon...

Page 16: ...act points A are bridged and the Dialock DC Cylin der is switched on both the LEDs in the panel light up After 1 second the red LED starts to flash It goes off altogether after another 3 secs Total RESET long RESET If the bridge is closed for more than 4 secs a total reset is carried out All configuration data are returned to their basic settings and all data includ ing user data are cancelled Rel...

Reviews: