Wall fixation
114
Technical changes reserved
Another new feature in New VegaD flush enclosures is the possibility to cut out the plastic top/bottom
part for inserting back panel in a hollow-wall with cable arrivals both sides top/bottom. It is only
possible with added opening in back panel. For this, a line has been designed on plastic part (black line
on the picture), so that the customer can follow it with its cutter and needs only to cut-out plastic.
As for Surface enclosures, a mounting hole has been created in top/bottom plastic part from back panel
for inserting a special water level. This level can be removed with a flat screwdriver. Water levels can be
ordered by Market Area at a supplier from Blieskastel.
Summary of Contents for New VegaD
Page 1: ...Technical Manual New VegaD for surface mounting flush mounting Accessories...
Page 42: ...Accessories 42 Technical changes reserved...
Page 47: ...Accessories Technical changes reserved 47 See mounting instruction below...
Page 48: ...Accessories 48 Technical changes reserved...
Page 52: ...Accessories 52 Technical changes reserved...