82
THIS IS JUST A GUIDE TO GET STARTED!
REFER TO THE RAVEN INSTALLATION
AND OPERATION MANUAL FOR MORE INFORMATION AND TROUBLE SHOOTING.
GETTING STARTED:
1. The entry sequence is always the same; 1) depress the key in which you wish to enter data, 2) depress
the ENTER key (an E will illuminate in the screen), 3) depress the keys corresponding to the number you
wish to enter ( the numbers will be displayed as they are entered), 4) complete the entry by again pressing
the ENTER key.
2. When the console is initially turned on, it will flash CAL and displayed ACRE US. This means that the con-
sole must be calibrated or programmed before it can be operated. Once the console is calibrated or pro-
grammed, you will not have to do it again unless you wish to make changes. All data is retained if the con-
sole is turned off.
3. If any error is made during the programming of the area measurement standard or the valve type, turn the
console OFF. Depress CE and hold while turning the console power ON.
IMPORTANT!
The information contained in this section is not meant to replace the information contained
in the Raven’s operational manual or the instructions of the chemical manufacturer. The information may need
to be adjusted to suit the varying conditions under which the machine is being used. We can not account for
the infinitely variable situations that may be unique to each machine, operator, and field/crop.
NOTE:
DATA MUST BE ENTERED INTO KEYS 3 THRU 7.
IMPORTANT:
Remember that the performance of the nozzle and the spray system is dependant on the performance of the
operator. If the system is operated within the parameters of the nozzle type and the machine/console set up,
you will see greater success with your application. Operating the machine even one or two miles per hour
faster or slower than intended will greatly change the outcome of the programmed spray job.
A. RAVEN CONSOLE (SPRAYER)
V.
SYSTEM PROGRAMMING
SYSTEM PROGRAMMING