9-8
SECTION 9 –
MISCELLANEOUS
Quick Connect Multi-Coupler
• Install the Hydraulic/Electrical Connections
(located on the left-hand side of attachment) into
the Multi-Coupler Receptacle (located on front
left-hand side of machine), ensuring full
engagement.
• Push the Quick Connect Handle (located on the
Hydraulic/Electric Multi-Coupler Assembly)
OUT to engage hydraulic/electrical
connections.
9. Rotate the NORAC Hand Valve -
if
equipped
(located on the left and right-
hand level cylinders) in the OPEN
(counter-clockwise) position.
10. Start the engine.
11. If the air bags were previously deflated,
raise the machine by rotating the corre-
sponding Air Suspension Valves in the
CLOCKWISE (Inflate) position.
12. Press and hold the Transom Switch
(located on the Hydrostatic Drive Control
Handle) in the UP position to raise the
boom until the Attachment Hooks fully
engage.
NOTE: Press and hold the Transom Switch
only until the Attachment Hooks
become fully engaged.
NOTE: Raising the attachment will allow the
weight of the boom to pull the
Attachment Hooks over the Mounting
Pins. You will notice a change of
weight as the machine begins to
support the attachment.
13. Engage the Quick-Tach Lock Assem-
blies by pushing the Lock Pins IN, ensur-
ing full engagement.
NOTE: If necessary, adjust the level
cylinders to free the Lock Pins.
Hydraulic/Electric Multi-Coupler Assembly
(Located on the front
left-hand side of machine)
• Quick
Connect
Handle
NORAC Hand Valve (2) -
if equipped
(Located on the left and
right-hand level cylinders)
-Typical View
* Right-hand level cylinder shown
Transom Switch - UP
(Located on the Hydrostatic
Drive Control Handle)
-Typical View
Summary of Contents for STS 10
Page 290: ......