7-1
5
- D
A
SH
/ A
UT
O
SECTION 7 – SPRAY SYSTEMS
SPRAY BOOM HOSE RING
INSTALLATION
(120/132’ Spray Booms)
Four (4) Boom Hose Rings have been
shipped loose with your machine and are located
inside the cab. Refer to the following instructions
to install rings before operating the spray booms.
To Install Boom Hose Rings
1. Engage the parking brake.
2. Start the engine.
3. Press and hold the corresponding Left and
Right-Hand Boom Switches (located on the
Hydrostatic Drive Control Handle) in the UP
position to remove boom wings from cra-
dles.
4. Press and hold the corresponding Left and
Right-Hand Boom Switches in the OUT posi-
tion to unfold the boom wings until
partially
open.
5. Press and hold the Transom Switch (located
on the Hydrostatic Drive Control Handle) in
the DOWN position and lower boom to the
ground.
6. Shut the engine off.
7. Obtain the four (4) Boom Hose Rings
(located inside cab).
8. Loosen nuts on each Boom Hose Ring and
remove bolts. Set aside for later use.
9. Rotate the Hose Routing Bracket (located
near the end of the outer boom fold) so the
wide end of bracket is facing outward
(towards hose), as shown.
NOTICE
Boom hose rings must be installed
initially before unfolding the spray
booms. Failure to comply will result in the
solution hoses becoming obstructed
with the boom, causing property
damage.
NOTICE
Unfold booms far enough to clear the
boom cradles only. Unfolding the booms
to the fully extended position before
installing the boom hose rings will result
in property damage.
Left and Right-Hand Boom Switches
(Located on the Hydrostatic
Drive Control Handle)
-Typical View
• Right
Boom
OUT
• Right
Boom
DOWN
• Right
Boom
UP
• Right
Boom
IN
• Left
Boom
UP
• Left
Boom
OUT
• Left
Boom
IN
• Left
Boom
DOWN
Summary of Contents for STS 10
Page 290: ......