7-58
SECTION 7 –
SPRAY SYSTEMS
3-Way Valve Handle Flow
Positions
Refer to the following illustration to
determine correct valve handle orientation
when operating the various 3-way valves
with this system.
Filling the Chemical Tank(s)
1. Ensure the Tank Drain Valves (upper
and lower) are in the OFF (Closed) posi-
tion.
2. Remove the Fill Port Lid (located on top
of the chemical tank) and set aside.
3. Pour product through fill port and fill
chemical tank to desired level.
4. Reinstall the Fill Port Lid.
Getting Started
G
H
I
K
J
NOTICE
Never attempt to operate the Modular
Injection System without solution in the
tank(s). Failure to comply may result in
equipment damage and will void the
warranty.
Fill Port Lid
(Located on the top of chemical tank)
-Typical View
Summary of Contents for STS/DPS Series
Page 2: ...5 DASH AUTO...
Page 5: ...Troubleshooting 10 38...
Page 52: ...SECTION 2 SAFETY AND PRECAUTIONS 2 15 650210 Located on each NORAC sensor...
Page 380: ...NOTES 5 DASH AUTO...
Page 381: ...NOTES 5 DASH AUTO...
Page 382: ...NOTES 5 DASH AUTO...