8-27
SECTION 8 –
DPS
12. On the Rate Controller Setup Screen,
press the Diagnostics Button.
13. On the Rate Controller Diagnostics
Screen, press the “Tests” tab.
14. On the drop down menu, select “Section
Test”.
NOTE: A chemical warning message will
appear on the display. Press the
Accept Button to acknowledge the
warning and continue.
15. On the Section Test Screen, check the
“Enable Pump” box and check all section
boxes, as shown in the following illustra-
tion.
16. Press the Master Spray Button to the ON
position. Press and hold the “+” button to
increase pump speed.
Diagnostics Button
(Located on the Rate
Controller Setup Screen)
-Typical View
* Your machine may vary,
depending on available equipment
“Tests” Tab
(Located on the Rate
Controller Diagnostics Screen)
-Typical View
* Your machine may vary,
depending on available equipment
Drop Down Menu
-Typical View
* Your machine may vary,
depending on available equipment
Chemical Warning Message
-Typical View
* Your machine may vary,
depending on available equipment
• Accept
Button
Summary of Contents for STS/DPS Series
Page 2: ...5 DASH AUTO...
Page 5: ...Troubleshooting 10 38...
Page 52: ...SECTION 2 SAFETY AND PRECAUTIONS 2 15 650210 Located on each NORAC sensor...
Page 380: ...NOTES 5 DASH AUTO...
Page 381: ...NOTES 5 DASH AUTO...
Page 382: ...NOTES 5 DASH AUTO...