SECTION 9 –
MISCELLANEOUS
9-5
4. Connect air supply to jack.
5. Tap air supply handle and slowly insert
jack into Lifting Point Containment
Ring.
6. Once jack is fully seated into the Lifting
Point Containment Ring, continue to
press and hold air supply handle until the
machine reaches desired height.
7. Install Lock Pins to the base of jack.
8. Reverse steps to lower machine.
Align Jack with Lifting
Point Containment Ring
-Typical View
Insert Jack into Lifting
Point Containment Ring
-Typical View
WARNING
Ensure lock pins are fully inserted at
base of jack. Do not rely on jack air
supply to support a raised machine.
Sudden loss of air pressure will cause
the machine to become unstable,
resulting in serious injury or death.
Lock Pin Installation
-Typical View
Summary of Contents for STS12i Combo
Page 276: ......