35-2
OPERATING INSTRUCTIONS
3. Raise both level cylinders up (A) with the level
controls on the hydrostatic lever (B) until mo-
tion stops (this will be within the range shown
on the MD3 display for each side and the in-
side green light (C) will illuminate showing you
are with in range). Following this step ensures
that the level cylinders are in the correct posi-
tion to unfold the 90ft boom later in your se-
quence. Note: While moving the level cylin-
ders, you can view their position on the MD3
display.
A
B
C
Summary of Contents for UpFront 120
Page 64: ...75 2 TROUBLE SHOOTING NOTES...