SECTION 7 –
SPRAY SYSTEMS
7-11
On the NORAC Pulse Monitor:
•
Press the Settings Button (wrench icon)
(located on the main “Run Screen”) to
navigate to the Settings Screen.
•
Press the Next Button (located next to
“Height”) and increase or decrease val-
ues to desired boom height.
On the Ag Leader Monitor:
•
Press the Boom Image (located on the
main “Run Screen”).
•
Press the Target Height Buttons (located
on the Boom Height Control Options
Screen) and increase or decrease val-
ues to desired boom height.
Further Information
Refer to the NORAC or Ag Leader
manufacturer’s operation manual for
complete operating/calibration instructions,
troubleshooting information, and safety
precautions.
Refer to “Specifications” provided in the
Introduction Section
elsewhere in this
manual for information on GPS dimensions
on your machine.
Enabling NORAC through the
End Row Management Switch
-If Equipped
(Typical View - appearance may vary,
depending on model)
1. Program the End Row Management
Switch (located on the Hydrostatic Drive
Control Handle) through the Machine
Display.
Refer to “Machine Display” provided in
Section 3 - Cab elsewhere in this manual
for initial setup instructions.
2. On the NORAC or Ag Leader main “Run
Screen”, press the “wrench” icon.
3. On the Settings Screen (1/3), press the
“right/forward” blue arrow icon to navi-
gate to the next screen.
End Row Management Switch
(Located on the Hydrostatic
Drive Control Handle)
-Typical View
Main Run Screen
-Typical View