Installation
Overview
• Pencil
• Masking Tape
• Pan or Bucket
HOT
A
B
D
G
C
E
F
G
H
L
T
V
W
X
J
O
COLD
Plan for Installation
Prior to installation, we recommend you read the entire manual to familiarize yourself with
the system, and help you determine the best location for installation. Please check and
comply with all local plumbing codes.
Note: Keep these instructions for future reference.
Prepare Site for Installation
NOTE: If you have metal drain pipes, consult a plumber for installation of drain connection.
• Prior to installation, close the cold water shut-off valve.
• Temporarily place system manifold, remineralizer, and
tank into the under sink cabinet or desired location to
ensure adequate space and proper positioning.
• 3/8" white tubing will be used to connect manifold to tank, and from faucet stem to
remineralizer. Measure out 3/8" white tubing from the top of the tank to the outlet side
of the system manifold and mark 3/8" tubing. Then measure remaining length of 3/8"
tubing from the remineralizer to the desired location of the faucet hole to ensure there
will be enough 3/8" tubing available for both connections. Wait to cut tubing and follow
instructions below.
• Remove system, remineralizer, and tank from under your sink to begin installation.
Step 1:
Install Brass Tee Fitting
Step 2:
Install RO System Manifold
Step 3:
Install Water Storage Tank
Step 4:
Install RO Faucet
Step 5:
Install RO Drain Connector
Step 6:
Connect Tubing
Step 7:
Stage 1–3 Filter Installation
Step 8:
Sanitize, Pressure Test,
Purge System