I. Brass Tee to Manifold “INLET”
(¼” white tubing)
1. Take the white tubing leading from the brass tee and insert it into the manifold
port labeled “INLET”. Remember to push it all the way in until it stops.
II: Manifold to Remineralizer
(3/8” red tubing included in packaging)
1. Insert one end into the manifold port labeled “FAUCET”.
2. Insert the other end into the remineralizer port labeled “INLET”.
III: Remineralizer to Faucet
(3/8” white tubing already attached to faucet)
1. Insert the 3/8” white tubing (that was installed in step 4) from the faucet into the
remineralizer port labeled “OUTLET”.
IV: Manifold to Tank
(3/8” white tubing already attached to tank)
1. Take the white tubing leading from the storage tank
and insert it into the manifold port labeled “TANK”.
Remember to push it all the way in until it stops.
V: Air Gap to RO Membrane
(¼” red tubing from faucet)
1. Insert restrictor into the end of the red tubing.
2. Attach ¼” red tubing to the 90° elbow until it stops.
3. Attach ¼” 90° elbow to the membrane drain port.
VI: Faucet to Drain Connector
(3/8” red tubing from faucet)
1. Take the 3/8” red tubing from faucet and insert it all the way into the drain connector.
V
II
IV
III
WARNING:
Faucet
will leak if
restrictor is
not installed