background image

1.Cut pipe

3.Insert the flare nut

4.Flare pipe

It becomes high 

midway.

The end is immersed

in water.

It waves.

The gap with the ground

is too small

Less than 5cm

There is the bad smell

from a ditch

2.Remove burs

0~0.5mm

1.0~1.5mm

1.5~2.0mm

Flare tool for R410A

Clutch-type

Conventional flare tool

clutch-type(Rigid-type) Wing-nut type (Imperial-type)

1.Power Source Installation

2.Cutting and Flaring Work of Piping

3.On Drainage

Check for Installation and Test Run

Check Items for Test Run

The power source must be exclusively used for air conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place, please install an

earth leakage breaker.

For installation in other places, use a circuit breaker as far as possible.

Pipe cutting is carried out with a pipe cutter and burs must be removed.

After inserting the flare nut, flaring work is carried out.

Please install the drain hose so as to be downward slope without fail.

Please don't do the drainage as shown below.

Please pour water in the drain pan of the indoor unit, and confirm that drainage is

carried out surely to outdoor.

In case that the attached drain hose is in a room, please apply heat insulation

to it without fail.

Please kindly explain to our customers how to operate through the instruction manual.

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of

indoor and outdoor firmly inserted

to the terminal block?

Is the connecting wiring of indoor

    and outdoor firmly fixed?

Is drainage securely carried out?

Is the earth line securely

connected?

Is the indoor unit securely fixed?

Is power source voltage abided

by the code?

Is there any noise?

Put check mark       in boxes

Is the lamp normally lighting?

Are cooling and heating (when

in heat pump) performed normally?

Is the operation of room temperature

regulator normal?

Flare tooling die

Correct

Incorrect

Lean Damage of flare Crack

Partial Too outside

A

8

Summary of Contents for 1051

Page 1: ...parts for piping Mark Parts name Non adhesive tape Adhesive tape Saddle L S with screws Connecting electric cable for indoor and outdoor Drain hose Heating insulating material Piping hole cover No Accessory parts Remote controller R 03 dry battery Mounting plate Drain elbow 1 1 2 3 4 5 6 2 1 4 1 1 Number of articles Accessory parts Pipe supporting plate Arrangement of piping directions Rear left R...

Page 2: ...g the remote controller on a wall place where the indoor unit can receive signals when the fluorescent lamps in the room are lightened Place which is less affected by rain or direct sunlight and is sufficiently ventilated Place possible to bear the unit where vibration and noise are not increased Place where discharged wind and noise do not cause a nuisance to the neighbors Place where a distance ...

Page 3: ...fter installation Section of wall hole Piping hole pipe Outdoor side Thickness of wall Indoor side Wall hole 60mm Indoor unit 1 Fitting of the Mounting Plate and Positioning of the wall Hole When the mounting plate is first fixed 1 Carry out based on the neighboring pillars or lintels a proper leveling for the plate to be fixed against the wall then temporarily fasten the plate with one steel nail...

Page 4: ...rain hose must be bound with refrigerant piping by protecting tape Cut away with a nipper the lid for piping according to the piping direction and then bend the pipe according to the position of wall hole When bending be careful not to crash pipes Connect beforehand the indoor outdoor electric cable and then pull out the connected to the heat insulation of connecting part specially Lid for right p...

Page 5: ...ted cable with the wiring cover Note When connecting the cable confirm the terminal number of indoor and outdoor units carefully If wiring is not correct proper operation can not be carried out and will cause defect 1 If the supply cord is damaged it must be replaced by the manufacturer or its service agent or a similar qualified person The type of connecting wire is H05RN F or H07RN F 2 If the fu...

Page 6: ...thened the refrigerant should be charged according to 20 g m But the charge of refrigerant must be conducted by professional air conditioner engineer Before adding additional refrigerant perform air purging from the refrigerant pipes and indoor unit using a vacuum pump then charge additional refrigerant CAUTION In case more than 5m Oil trap shoud be installed every 5 7m Max Length A 20m Max Elevat...

Page 7: ...ervice port open 2 way valve and 3 way Turn the valve rod anticlockwise until hitting lightly To prevent the gas leakage turn the service port s cap the valve rod s cap for 2 way valve and 3 way s a little more than the point where the torque increases suddenly After attaching the each caps check the gas leakage around the caps CAUTION 1 If the refrigerant of the air conditioner leaks it is necess...

Page 8: ...arried out Please install the drain hose so as to be downward slope without fail Please don t do the drainage as shown below Please pour water in the drain pan of the indoor unit and confirm that drainage is carried out surely to outdoor In case that the attached drain hose is in a room please apply heat insulation to it without fail Please kindly explain to our customers how to operate through th...

Page 9: ...duct is marked with this sym bol This means that electrical and electronic products shall not be mixed with unsorted household waste Do not try to dismantle the system yourself the dis mantling of the air conditioning system treatment of the refrigerant of oil and of other part must be done by a qualified installer in accordance with relevant local and national legislation Air conditioners must be...

Page 10: ...e los productos eléctricos y electrónicos no deben mezclarse con el resto de resi duos domésticos no clasificados No intente desmontar el sistema usted mismo El des mantelamiento del acondicionador de aire así como el tratamiento del refrigerante aceite y otros compo nentes debe ser efectuado por un instalador compe tente de acuerdo con las normas locales y nacionales aplicables Los acon dicionado...

Page 11: ... the additional refrigerant amount charged in the field and 1 2 the total refrigerant charge on the refrigerant charge label supplied with the product The filled out label must be adhered in the proximity of the product charging port e g onto the inside of the stop valve cover A contains fluorinated greenhouse gases covered by the Kyoto Protocol B factory refrigerant charge of the product see unit...

Page 12: ... refrigerante cargado en campo y 1 2 la carga total de refrigerante En la etiqueta de carga de refrigerante suministrada con el producto La etiqueta rellenada debe pegarse cerca de la conexión de carga del pro ducto p ej en el interior de la cubierta de la válvula de tope A Contiene los gases fluorados de efecto invernadora regulados por el Protocolo de Kioto B Carga de refrigerante de fábrica del...

Reviews: