38
(2) Please keep the pliers, pipe cutting unit and Hansen valve clean, and
keep them away from grease dirt.
12.5.3 Procedure for filling equipment
(1) Preparation before use
①
Visually inspect recovery machine for abnormalities, etc.
②
Keep all valves closed to equipment until really to proceed.
(2) Evacuation
①
Connect recovery machine hoses to system fittings
②
Switch on power.
③
Switch on motor.
④
Open all related valves.
⑤
Observe the pointer of vacuum meter when it is accessing the mark
–
1.
⑥
Evacuation time shall not be less than 45 min.
⑦
After evacuation close valves.
MAINTENANCE SERVICE AND TROUBLE SHOOTING
Maintenance Service and Trouble Shooting
⑧
Switch off motor.