10
INSTALLATION INSTRUCTIONS
5
Connect the check valve assembly
Place the check valve gasket and check valve assembly onto the air outlet on top of the
main unit, and screw in place using the 8 cross recessed pan head screws.
6
Secure the main unit (this requires 2 persons)
Attach the main unit to the wall plate. Ensure the main unit and wall plate are firmly
locked together.
7
Secure the stopper screw
Screw in the stopper screw at the top of the housing, ensuring that the screw is tightly
secured against the main unit.
8
Connect the universal ducting hose
●
Insert the unmarked end of the universal ducting hose into the recess of the check valve,
and secure to the check valve assembly with the self-tapping screws.
●
Connect the other end of the ducting hose to a shared flue or external wall hole.
●
venting performance. The number of bends should be minimised. Flexible ducting should
be stretched tight and trimmed to suit the installation.
9
Extend the inner decorative cover (if inner decorative cover extension is to be used)
Pull the inner decorative cover up and hook it onto the decorative cover holder.
10
Fit the oil receptacle
●
Slide the oil receptacle into the slot on the oil cover
.
●
Make sure the oil receptacle is pushed all the way
in.
11
Remove packaging
Remove all protective wrappings.
The length of the universal ducting hose should not exceed 3 metres to prevent impact on