Commissioning
Commissioning must be carried out by person(s) suitably qualified and authorised to carry out mechanical and
electrical maintenance.
Check that the machine is isolated from the electrical power supply. If not, isolate.
Mechanical checks
•
Ensure the machine has been securely bolted down.
•
Clean off any accumulated surface dust and dirt.
•
Check inside the machine and surrounding area for tools, fasteners, rubbish or other foreign objects and
remove them accordingly. Most problems which arise during the first hours of operation are caused by such
matter.
•
Check that the water is connected and turned on.
•
Check that the drain is connected.
Electrical checks
•
Check that the electrical connection is made in accordance with the previous section.
Summary of Contents for Quattro Vanguard Original
Page 1: ...Page 1...
Page 2: ...Page 2...
Page 3: ...Page 3...
Page 12: ...Page 12 Technical diagram...
Page 17: ...Page 17 1...
Page 32: ...Page 32 General assembly...
Page 37: ...Page 37 Main pump removal diagram 3...
Page 38: ...Page 38 Mechanical assembly removal diagram 3 4 5 6...
Page 40: ...Page 40 Plumbing diagram...
Page 43: ...Page 43 Wiring diagram single phase 1 PHASE MOTOR 120 VOLTS 1 PHASE PUMP MOTOR 120 VOLTS...
Page 49: ...Page 49...