Installation Procedure
Having read and understood the preceding contents of this chapter:
1.
Position the floor template -
Place the template in the
desired position on the floor.
Ensure that there is sufficient clearance behind the
machine for cleaning requirements.
CAUTION: Before drilling, check & position the
template to ensure that the holes do not affect
under floor heating or other services.
2.
Drill holes -
Place the floor locating bracket in the position
indicated on the template and drill the fixing holes.
Ensure
the template is not moved while drilling
.
3.
Remove template -
Take the template away and replace
the floor locating bracket.
4.
Secure the bracket -
Using the desired floor fixing fasteners
(not supplied) bolt the floor locating bracket to the floor.
Ensure the floor locating bracket is fitted the correct way
round as indicated on the template. The machine should be rigid with compression on the rubber
mounting keeping the machine secure.
5.
Position -
Lift the rear of the machine centrally over the floor locating bracket. Slide the machine
forward on the runners underneath, until the floor locating bracket locates in the two guide slots in the
runners.
6. Secure the machine and connect services:
•
Replace the mounting base bolt under the motor to secure the machine in position.
•
Make the waste connection from the internal ‘P’ trap (to mains sewage only). Ensure that
connecting pipe is cut square and deburred before fitting to prevent the waste snagging within
the pipework and restricting the flow.
•
The cistern overflow indicator pipe discharge should remain visible to indicate an overflow
condition. A tundish device is available as an optional extra to direct overflow water to a drain.
•
Connect the mains cold water inlet supply. Open the inlet isolating valve.
•
Connect the flying lead supplied ready fitted to the machine, to the installation isolator. Note
advice on electrical information page.
•
Turn on the electrical supply. The inlet solenoid valve opens to admit water to the cistern.
•
Continue with commissioning the machine. Ensure the rotational direction of the machine is
correct. A direction of rotation label with cord tail is attached to the impeller in the hopper. The
cord trail must indicate the trail towards the tick. This is only needed for the three phase
machine.
7.
Fit front panel -
Refit the front panel. Secure with the front panel screw.
Summary of Contents for Quattro
Page 1: ......
Page 3: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16...
Page 4: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16...
Page 6: ...www haigh co uk 900 029082 4 Dec 16...
Page 8: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 2...
Page 12: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 6...
Page 14: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 8...
Page 16: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 10 Installation Diagram...
Page 22: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 16...
Page 24: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 18...
Page 32: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 26...
Page 36: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 30...
Page 38: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 32 General Assembly...
Page 46: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 40...
Page 48: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 42 Plumbing Diagram...
Page 52: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 46 Wiring Diagram 3 Phase...
Page 56: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 50...
Page 60: ...Operating Maintenance Manual www haigh co uk 900 029082 4 Dec 16 54...