7 / 35
Hakki Pilke XL - Conveyor
Translated
version 4-2021
3. Install the conveyor belt and connect the hoses as shown in Section 3.
4. Lift the conveyor on the base, and connect the bottom section to the base with rods. Lock the rods
with pins, as shown in Section 4.
5. Install debris removal, as shown in Section 5.
•
4 m conveyor: as shown in Section 5.1
•
6 m and 8 m conveyor: as shown in Section 5.2
6. Connect the conveyor to the base lifting device
•
4 m conveyor: as shown in Section 6.1
•
6 m conveyor: as shown in Section 6.2
•
8 m conveyor: as shown in Section 6.3
7. Install the firewood guide plates as shown in Section 7.
Summary of Contents for XL Conveyor 1
Page 9: ...9 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 1...
Page 10: ...10 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 2 1...
Page 11: ...11 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 2 2...
Page 12: ...12 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 2 3...
Page 13: ...13 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 3...
Page 14: ...14 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 4...
Page 15: ...15 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 5 1...
Page 16: ...16 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 5 2...
Page 17: ...17 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 6 1...
Page 18: ...18 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 6 2...
Page 19: ...19 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 6 3...
Page 20: ...20 35 Hakki Pilke XL Conveyor Translated version 4 2021 Section 7...