13
Power and Air/N2 Connections:
Connect air or nitrogen to the rear panel fitting using ¼ inch plastic tubing. (See Fig. 20 on page 11) The
supply gas must be clean, dry and regulated to 60PSI. The supply should be capable of delivering 5
CFM minimum continuous supply at 80 PSI. Poor filtration or wet air lines will degrade heater and
pneumatic component performance.
Plug the power cord into an appropriate, dedicated 120VAC outlet. It is now safe to turn on the power
to the machine. The machine will run through a brief self-check on power-up and then be ready for
operation. See section 4.0 Operation and Programming, Section 7.0 HMI Software guide, or Section 8.0
Thermal Analysis and Control Software for more information.
Repackaging the system:
Reverse the unpacking procedure, taking special care to secure all moving parts as indicated.
Note: The minimum packaging for local delivery or relocating of systems requires that the machine be
securely fastened to a cushioned skid, with the head blocked, axes locked, bottom heater covered, and
system shrink-wrapped as described in this section.