X56b550.fm
4-53
Maintenance
4.19 Maintenance report
The following table provides a general overview of the maintenance work
to be carried out after the corresponding number of operating hours. You
will find the maintenance schedules in Section 4.18.
Completion of the work must be confirmed by the service center con-
tracted in the following table.
Warranty and claims under the terms of warranty will only be considered
only when all maintenance work has been performed by an authorized
service center and registered Hako GmbH. In this context, we refer
you to the warranty conditions of Hako GmbH.
After op. hr
.
Maintenance plan
Date
Operating
hour reading
Company/
Signature
Handover
50
1st inspection
250
2nd inspection
500
A
1000
A
1,500
B
2,000
A
2,500
A
3,000
B
3,500
A
4,000
A
4,500
B
5,000
A
5,500
A
6,000
B
6,500
A
Maintenance
Summary of Contents for Citymaster 2000 1480
Page 32: ...2 16 X56b210 fm Safety Information...
Page 36: ...3 4 X56b310 fm Operation 29 30 40 22 24 28 27 31 23...
Page 40: ...3 8 X56b310 fm Operation 81 77 78 79 81 77 78 87 88 89 90 82 84 80 83 85 86 79...
Page 44: ...3 12 X56b310 fm Operation 127 126 129 130 124 125 123 128 131...
Page 46: ...3 14 X56b310 fm Operation 140 139 138 137 136 135 134 133 132 141 145 144 143 142 146...
Page 192: ...4 64 X56b570 fm Maintenance...