13
First Operation
2
First Operation
2.1
Instruction
Instruction is required before first oper-
ation. First instruction into handling of
the machine must be held by a qualified
person sent by your local Hako contract
dealer. Your Hako dealer will be in-
formed by the manufacturer upon deliv-
ery of the vehicle and will contact you to
make a date for instruction.
2.2
Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the op-
erating instructions of the
charger as well as with those of
the battery manufacturer.
Hako cannot be held liable for
damages resulting from an in-
sufficient initial charge.
2.3
Before Putting into Operation
Complete the following inspections be-
fore taking the machine into operation:
1. Check the area around the machine
for signs of leakage. Hoses, lines
and tanks must be free from any
leakage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and proceed
to re-charging of batteries if required.
Generally proceed to initial charging
before first operation of the machine.
5. Empty recovery tank and clean it if
required, see maintenance chapter.
6. Re-fill solution tank and add cleaning
agent according to the manufactur-
er's recommendations.
Use only cleaning agents suit-
able for automatic machines
(low-foaming) and comply with
the instructions for use, dispos-
al and with the warning infor-
mation specified by the clean-
ing agent's manufacturer.
2.4
Switching the machine on
Before switching the machine
on, please read the safety in-
formation in Chapter 1.
Switch the machine on by actuating the
switch (Fig. 3/1) from position (0) to po-
sition (1).
Fig. 3
1