background image

2

B400 R (7190)

Hako system maintenance

Hako system maintenance

The Hako system maintenance specifies in single modules the special 
technical work to be done and the periods of time for the maintenance 
activities. Parts to be replaced for the individual maintenance tasks are 
determined.
Hako system maintenance:
• Assures the reliable readiness for use of the Hako cleaning machines 

(preventive maintenance).

• Minimises operating costs, repair costs, costs for maintenance.
• Assures long life and readiness for use of the machine.

Hako system maintenance I (every 250 hours):

Performance by an expert of an authorised Hako workshop by reference to 
the machine-specific system maintenance.

Hako system maintenance II (every 500 hours):

Performance by an expert of an authorised Hako workshop by reference to 
the machine-specific system maintenance.

Hako system maintenance III/S (every 1000 hours/safety check):

Performance by an expert of an authorised Hako workshop by reference to the 
machine-specific system maintenance at least once a year. Performance of all 
legally stipulated safety-relevant tests according to the BGV specifications.

Machine data

Your machine is described clearly by the following data. 

•

Machine type:

•

Manufacturing no.:

•

Start-up on:

Your nearest authorised Hako dealer:

•

Address:

•

Telephone:

Attention

Before undertaking maintenance work, read and observe the safety 

instructions in the operating manual!

Summary of Contents for Scrubmaster B400 R

Page 1: ...Scrubmaster B400 R RM RH 7190 Service booklet Part number 88 10 3256 Valid as from 03 2021...

Page 2: ...ised Hako workshop by reference to the machine specific system maintenance Hako system maintenance II every 500 hours Performance by an expert of an authorised Hako workshop by reference to the machin...

Page 3: ...ating hours Workshop stamp performed on at _______________ operating hours Hako system maintenance I 1750 operating hours Workshop stamp performed on at _______________ operating hours Hako system mai...

Page 4: ...controllers drive control power relays fuses power distributors Steering and brake Check the steering for stiffness Check bearing clearance of the pinion and the universal joints Check the steering p...

Page 5: ...flex wall for damage Check the fresh water level indicator calibrate if necessary Check leak tightness and proper functioning of the drain hoses fresh and waste water replace if necessary Check the c...

Page 6: ...necessary Check proper functioning of the coarse dirt flap lock only B400 RH High pressure cleaner One off oil change For oil see annex Engine Vehicle fluids Spray the following locations on the mach...

Page 7: ...he sweeping roller motors and check the carbon brushes for ease of movement and wear replace carbon brushes if necessary at the latest after 2000 operating hours Change the V belt in the pre sweep suc...

Page 8: ...Hako GmbH Head Office Hamburger Str 209 239 23843 Bad Oldesloe Germany Tel 49 4531 806 0 info hako com www hako com...

Reviews: