24
03-7150-00.fm
Operation
3 Operation
3.1
Initially starting up the machine
3.2
Initial machine start-up
1. Install the cleaning tools and squeegee, see chapter Maintenance.
2. Always carry out a commissioning charge of the battery before first use.
3. Fill the solution tank and add detergent according to the manufacturer’s
specifications, see section 3.3.1.
3.3
Daily start-up
1. Check the parking area for signs of leaks. Cables and tanks must not show
any sign of leaks or damage.
2. Check the cleaning tools for coarse parts, remove them if necessary.
3. Check the battery charge and recharge it as required, see chapter
Maintenance.
4. Fill the solution tank and add detergent according to the manufacturer’s
specifications, see section 3.3.1.
5. Empty the waste water tank if necessary.
Attention
• Before initially starting up the machine, charge the used batteries
fully and appropriately with commissioning charge. Hako
assumes no liability for battery damage resulting from insufficient
commissioning charge.
• Check the machine for operating safety before every start-up!
Eliminate faults immediately.
• Before starting work, operators must familiarise themselves with
all equipment, operating and actuating elements as well as with
their function!