- 26 - 

 

12  Maintenance printout 

Name of item: Climbing Game – Trampoline Circus __  / Art. No. 20.02.112  ____________________________________  

Location:   _______________________________________________________________________________________  

Customer or operator:  _____________________________________________________________________________  
(Town, Town council, Kindergarten) 

 

Date of 

inspection 

Inspector 

O.K. 

Accessible  Barriered 

Defects 

Repaired 

by 

Date 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Please copy and return once a year after main inspection has been carried out to the manufacturer by Telefax 
+49(0)6443/ 83 11 79! 
Place the confirmation form in the play equipment files. 

Summary of Contents for 20.02.112

Page 1: ...lplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 1 A Assembly instructions Trampoline Circus Art 20 02 112 Operator _____________________________________________________ Location ______________________________________________________ ...

Page 2: ...tzgeraete de www hally gally spielplatzgeraete de 2 Y Mont anv 2010 Trampolin Circus_002 2 doc Revision history Revision 0 2010 06 18 The first allowed version Assembly instructions JF Revision 2 2013 09 02 Achtung Trennfuge FH All rights reserved Copyright 2010 Spogg Sport Güter GmbH ...

Page 3: ...cus Art 20 02 112 6 3 Delivery contents parts list with part numbers 7 4 Post installation checks 15 B Maintenance instructions Trampoline Circus Art 20 02 112 17 5 Introduction Maintenance 19 6 General maintenance information 20 7 Maintenance timetable 22 8 Monthly maintenance 23 9 Quarterly maintenance 23 10 Half yearly maintenance 23 11 Annual maintenance 25 12 Maintenance printout 26 13 Hand o...

Page 4: ...s that may be required can be obtained directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions Following installation complete assembly instructions maintenance instructions and a maintenance record must be sent to the operator who must confirm receipt in writing See the last page of this document All n...

Page 5: ... views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the properties and characteristics of the components minor measurement tolerances compared to the indication on the sketches are possible This concerns all shown measurements ...

Page 6: ...s recommended by manufacturer Critical fall height as checked a Appropriate ground material prepared for use at playgrounds b In case of loose fill material 100mm have to be added onto the minimum layer thickness to compensate the falling away effect see 4 2 8 5 1 c Without silty or clayey proportions Grain size can be determined by a sieve test according to EN 933 1 d See note 1 in 4 2 8 5 2 3 Na...

Page 7: ...y spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 7 3 Delivery contents parts list with part numbers 3 1 In words Table 3 1 Delivery contents in words Pos Quantity Element Description Size O K Missing 1 1 Round trampoline Ø 1 90m 2 4 Foundation ring Ø 1 90m 3 16 Bolts M10x12mm 4 16 Nyloc nuts M10 ...

Page 8: ...4 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 8 Y Mont anv 2010 Trampolin Circus_002 2 doc Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 Ø 1 90 m 2 1 3 16 M10 x 12 mm 4 16 M10 ...

Page 9: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 9 ...

Page 10: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 10 Y Mont anv 2010 Trampolin Circus_002 2 doc ...

Page 11: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 11 ...

Page 12: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 12 Y Mont anv 2010 Trampolin Circus_002 2 doc ...

Page 13: ...4 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 13 Attention The split line of 10mm is required to keep the trampoline removeable for maintenance work ...

Page 14: ...low for working space pit Ø 2 40 m G Drainage layer O K Top ground level PS Place requirement RN In case of using wetpour the cleaning of the outer gaps is mandatory Lift the trampoline with 4 people even out of the ground After cleaning set the trampoline carefully back onto the plasticframe PS Space required including safety zone mE Refill and compact See drawings for details of shortcuts ...

Page 15: ...fely in the following cases Installation of equipment is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 4 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from the playing area The equipment must not be approved for use until this check has been carried out 4 4 Information about...

Page 16: ......

Page 17: ...GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 17 B Maintenance instructions Trampoline Circus Art 20 02 112 ...

Page 18: ...geraete de www hally gally spielplatzgeraete de 18 Y Mont anv 2010 Trampolin Circus_002 2 doc Revision history Revision 0 2010 06 18 The first allowed version Maiantanance instructions JF Revision 2 2013 09 02 Achtung Trennfuge FH All rights reserved Copyright 2010 Spogg Sport Güter GmbH ...

Page 19: ...N 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier This equipment should only be assembled maintained and repaired by persons with the necessary expertise A copy of the inspection record sh...

Page 20: ...ne of the characteristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 6 4 Spare parts All spare parts must conform to the manufacturer s specifications 6 5 Identifying spare parts All spare parts are listed in the parts list The parts list follow...

Page 21: ...d checks carried out to ensure that there are no missing screws 6 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 6 12 Claims liability for faults steel poles Steel posts and footings are covered by our guarantee if refular maintenance is carried out and recorded in writing Our general terms and...

Page 22: ... equipment 7 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 7 1 3 Faults that compromise safety In the event of a fault that compromises safety quick action must be taken This may involve repairing it immediately or shutting down and dismantling the equipment 7 1 4 ...

Page 23: ...parts sleeves etc for wear and tear or damage and replace if necessary 8 7 If necessary remove excess padding material from the post footings due to danger of rotting 8 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 8 9 Check the surface of plastic and metal parts e g slides for damage and replace if necessary 9 ...

Page 24: ...5614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 24 Y Mont anv 2010 Trampolin Circus_002 2 doc repairs have been carried out or additional system components have been installed or replaced ...

Page 25: ...surfaces are safe for operation 11 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by someone with the necessary expertise in strict compliance with the instructions issued with the product A copy of the...

Page 26: ...________ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date of inspection Inspector O K Accessible Barriered Defects Repaired by Date Please copy and return once a year after main inspection has been carried out to the ...

Page 27: ......

Page 28: ..._________________________________________________ ______________________________________________________________ Competent person in charge ______________________________________________________________ ______________________________________________________________ Installation company address ______________________________________________________________ __________________________________________...