background image

Page 1

98767C  (Rev. A - 6/11)

HVRGRN8WS*1B   HVRGRN8BLWS*1B

HTHB-HVRGRN Factory Prep

Hydroboost  Bottle Filling Station and Cooler

HTHB-HVRGRN Bottle Fillers are among the easiest to install on the market today.
To insure you install these models easily and correctly,  PLEASE READ THESE
SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK
YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL, AND
OTHER APPLICABLE CODES. After installation, leave these instructions with the
Fountain for future reference.

IMPORTANT

THIS IS AN INDOOR APPLICATION ONLY.
ALL SERVICE TO BE PERFORMED BY AN

 AUTHORIZED SERVICE PERSON.

IMPORTANT! INSTALLER PLEASE NOTE.

THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES
IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE
BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELEC-
TROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER.
THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS
PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN
FROM THE BUILDING PLUMBING SYSTEM. WE SUGGEST THAT THE BOTTLE FILLING STATION AND WATER
COOLER BE PROTECTED BY A GROUND FAULT CIRCUIT INTERRUPTER (GFCI).

INSTALLER

TOOLS REQUIRED

BUT NOT PROVIDED:

SAFETY GLASSES
GLOVES
ELECTRIC DRILL
3/4” WRENCH OR CRECENT WRENCH
5/16” NUT DRIVER
UTILITY KNIFE
TAPE MEASURE
PENCIL
CENTER PUNCH
1/2” SOCKET & RATCHET WRENCH
5/32” ALLEN WRENCH

Installation/Care/Use Manual

Summary of Contents for GreenSpec HTHB-HVRGRN

Page 1: ...UIPMENT SUCHAS TELEPHONE COMPUTERS ETC TO WATER LINES IS ACOMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICALFEEDBACK INTOAFOU...

Page 2: ...11 16 18mm 2 7 16 63mm 3 1 2 89mm 4 1 2 114mm 5 127mm 9 15 16 252mm A D B E E F 18 3 8 467mm 21 3 8 543mm 25 635mm 30 15 16 786mm 51 9 16 1310mm Single Rough In Fig 1 HTHB HVRGRN REDUCE HEIGHT BY 3 FO...

Page 3: ...4 1 2 114mm 3 1 2 89mm 6 1 4 159mm FINISHED FLOOR 13 13 16 351mm 18 3 4 477mm 20 1 8 511mm 25 1 8 638mm 8 203mm 6 3 4 171mm 12 5 16 313mm 6 1 2 165mm 27 686mm 31 13 16 809mm RIM HEIGHT 32 15 16 837mm...

Page 4: ...mounting screws from step 1 above Caution do not over tighten screws 11 For Single Model Installations Install remaining tube insulation to the water line from bottle filler connect Bottle Filler wat...

Page 5: ...be illuminated indicating that the visual filter monitor has been reset SETTING RANGE OF THE IR SENSOR 1 Depress the program button for approximately 2 seconds until the display changes then release T...

Page 6: ...allow approximately 4 seconds to pass and then the display will go back to bottle counter and be in run mode 6 Test bottle filler by placing bottle or hand in front of sensor to make sure water is dis...

Page 7: ...C 98544C 98545C 98546C 98666C 98667C 98549C 98668C 98552C Kit Electrical Package Kit IR Sensor Kit Solenoid Valve Replacement Kit Aerator Replacement Kit Top Cover Replacement Kit Drain Mat Cover Repl...

Reviews: