6
2000225116B
1.5 Gas Supply
The gas installation shall be in accordance with the relevant
standards.
In GB this is BS6891.
In IE this is the current edition of I.S.813 "Domestic Gas
Installations".
The supply from the governed meter must be of adequate size
to provide a steady inlet working pressure of 20mbar (8in wg) at
the boiler.
On completion test the gas installation using the pressure drop
method and suitable leak detection fluid, purge in accordance
with the current issue of BS6891.
1.6 Electrical
WARNING. This boiler must be earthed.
The electrical installation must be carried out by a competent
person. All external components shall be of the approved type
and shall be connected in accordance with the current issue of
BS7671 and any local regulations which apply.
External wiring must be correctly earthed, polarised and in
accordance with the relevant standards.
In GB this is BS 6891.
In IE this is the current edition of I.S.813 "Domestic Gas
Installations".
Connection of the boiler and any system controls to the mains
supply through an unswitched shuttered socket outlet and 3A
fused 3 pin plug, both to the current issue of BS1363.
Alternatively, a 3A fused double pole isolating switch may be
used, having a minimum double pole contact separation of
3mm, serving only the boiler and system controls.
Heat resistant cable of at least 0.75mm
2
(24/0.20mm), to the
current issue of BS6500 Table 16, must be used for all
connections within the boiler casing, to the control box, pump
etc.
BOILER CASING HEIGHT(S)
Diagram 1.4
BOILER
CASING
ALTERNATIVE
HEIGHT
POSITIONS
MIN.
MAX.
To
floor
level
FLOOR LEVEL
9922
1 General Data
Diagram 1.5
MINIMUM CLEARANCES
LEVEL WITH WORKTOP
9923
494 MIN.
494 MIN.
CUPBOARDS
WORKTOP
10
10
BOILER
BOILER
5
MAX.900
MIN. 860
Diagram 1.3
10184
Diagram 1.2
10183