background image

8

2000225008D

Diagram 2.2

FULLY PUMPED SYSTEM
(DIAGRAMMATIC)

2  Water  Systems

0870

1 metre
MIN.
27metres
MAX.

PUMP

Heating
Circuit

TO INDIRECT
CYLINDER

22mm VENT

15mm 
COLD FEED

Distributor tube in
pumped return
connection

BOILER
    CL

DRAIN OFF
COCK

2.1 Water Pressure Head

The boiler shall only be connected to a cistern water supply with
a minimum head of 1metre (3ft3in) and a maximum head of
27metres (90ft) which has an open vent in the system.

The working pressure must be within the range 0.1bar to 2.7bar
(1.3 to 39lbftin

2

).

The boiler MUST NOT be connected to a sealed water system.

2.2 Inhibitor

Attention is drawn to the current issue of BS5449 and BS7593
on the use of inhibitors in central heating systems.

If an inhibitor is to be used in the system, contact should be
made with the inhibitor manufacturers so that they can
recommend their most suitable product.

When using in an existing system take special care to drain the
entire system, including the radiators, then thoroughly clean out
before fitting the boiler whether or not adding an inhibitor.

2.3 Gravity Domestic and Pumped Heating

It is recommended that a cylinder thermostat is used to prevent
the stored water temperature becoming unnecessarily high
when the central heating pump is off.

The domestic primary flow and return must be 28mm o.d.  The
installation must comply with the current issue of BS5546 and
BS6700, see diagram 2.1.

If the above conditions cannot be met, it is suggested that a fully
pumped system be used.

2.4 Pumped Heating and Hot Water

Where a single flow and return is taken from the boiler, a
minimum static head of 1metre (3ft3in) must be provided
between the water line of the feed tank and the centre of the
waterway, see diagram 2.2.

2.5 Circulation Pump

Normally the pump should be set to give a temperature difference
of 11

o

C (20

o

F) across the boiler.  At the appropriate pumped flow

rate the pressure loss through the boiler can be found from the
graph, diagram 2.3.

Use a pump with integral valves or fit isolating valves as close
to the pump as possible.

2.6. Cylinder

For all systems supplying domestic hot water the cylinder must
be indirect.

2.7 Safety Valve

A safety valve need not be fitted to an open vented system.

2.8 Draining Tap

A draining tap must be provided at the lowest points of the
system which will allow the draining of the entire system,
including the boiler and hot water cylinder.

Draining taps should be to the current issue of BS2879.

2.9 Thermostatic Radiator Valves

If thermostatic radiator valves are fitted care must be taken to
ensure that there is an adequate flow rate through the boiler
when they close, refer to the current issue of BS7478 for
guidance.  If fitted to all radiators ensure a bypass is fitted and
adjust to achieve a temperature difference no greater than 20

o

C

between flow and return with the thermostatic valves closed.

Diagram 2.3

1.50

1.25

1.00

0.75

0.50

0.25

0

30

20

10

0

0

6

12

18

24

30

36

42

FLOW RATE (LITRES/MINUTE)

WATER PRESSURE LOSS

(metre HEAD OF WATER)

WATER PRESSURE LOSS

(INCHES HEAD OF WATER)

60

40

2.00

70

50

1.75

0

1

2

3

4

5

6

7

8

9

FLOW RATE (GALLON/MINUTE)

1074

Diagram 2.1

0869

27metres 
Max.

PUMP

Heating
Circuit

INDIRECT
CYLINDER
(Shown with
recommended
thermostat and valve).

22mm VENT

15mm COLD FEED

REFER TO BS 5546

28mm

Distributor tube in
pumped return
connection

BOILER
    CL

DRAIN OFF
COCK

Summary of Contents for Buckingham 4 CFF80

Page 1: ...an integral part of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f t w...

Page 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Page 3: ...the boiler be drained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensurethecontinuedefficientandsafeoper...

Page 4: ...trol wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic lighting sequence will operate again when heat is required It should be noted...

Page 5: ...290lb Water content 5 76 litre 1 27gallons Gas connection Rc1 2 1 2 in BSPT Water connection Rc1 1in BSPT Electrical supply 230V 50Hz fused 3A Burner Aeromatic GENERAL DIMENSIONS given in millimetres...

Page 6: ...s installation using the pressure drop method and suitable leak detection fluid purge in accordance with the current issue of BS6891 1 6 Electrical WARNING This boiler must be earthed The electrical i...

Page 7: ...hat nothing will obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartm...

Page 8: ...rom the boiler a minimum static head of 1metre 3ft3in must be provided between the water line of the feed tank and the centre of the waterway see diagram 2 2 2 5 Circulation Pump Normallythepumpshould...

Page 9: ...sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge height but at the least above the eaves of a pitched roof Use...

Page 10: ...containingtheboilermusthavethedoorremoved for ventilation reasons The air vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both t...

Page 11: ...ay be used Heating return The water distributor tube must be fitted into either of the front lower connections on all installations see diagram 4 2 This tube is in the fittings pack Domestic return An...

Page 12: ...lbowisused Ifthepipeworkisrequired to run back to the wall make sure that it will clear the boiler air duct and if working to minimum clearance does not project too far from the boiler see diagram 4 5...

Page 13: ...er connections are made on both sides of the boiler or if the boiler is screened by fixtures The in fill panel will usually be fitted on the side where there are no pipework connections Insert the pus...

Page 14: ...screw select and fit appropriate restrictor Marked C then secure in place with the previously removed screw To connect a condensate drain remove plastic end stop by depressing the collet Slide the Ch...

Page 15: ...ndensate drain connection on the chimney flue adapter remove the end stop see diagram 4 14 A 22mm plastic overflow pipe should be used to fit on to the drain connectionanddischargetoadrain Thedrainpip...

Page 16: ...ke sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth cond...

Page 17: ...COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J DATA LABEL E D A G T...

Page 18: ...dent on the heat setting Turn the boiler temperature control fully anti clockwise to 0 Isolate from the electrical supply Remove the pressure gauge from the test point and refit screw making sure a ga...

Page 19: ...be assured conform to the safety and performance specification that we require Do not use reconditionedorcopypartsthathavenotbeenclearlyauthorised by Halstead Boilers Ltd Products of Combustion Check...

Page 20: ...that secures the top of the heat shield and carefully hinge down control box and heat shield see diagram 8 6 Release the two toggle latches that secure the fan access door and remove see diagram 8 7...

Page 21: ...rear of the burner to release the burner see diagram 8 10 Clean the burner Use a vacuum cleaner or suitable stiff brush not wire to clean the burner thoroughly making sure that all the burner ports a...

Page 22: ...side and rear insulation panels in the combustion chamber Check the condition of the seals on the boiler access door and the combustion chamber cover Examinethefluehoodandterminaltomakesuretheyare cl...

Page 23: ...controls are calling for heat and circuit water is cold If neon 6 is lit flame failure has occured Reset boiler by turning temperature control to Off waiting 30 seconds and then on If fault persists...

Page 24: ...CUIT BOARD CONNECTIONS b b b N b N MAINS SUPPLY 230v 50Hz 9 2 Electrical Supply Failure Failure of the electrical supply will cause the burner to go out Operationwillnormallyresumeontherestorationofth...

Page 25: ...3 NEON 4 NEON 5 NEON 6 NEON KEY see P C B FAN P C B CONTROL BOARD GAS CONTROL VALVE TERMINAL BLOCK THERMISTOR AIR PRESSURE SWITCH NEON 1 NEON 5 NEON 4 NEON 6 NEON 2 NEON 3 F4A FUSE p y g p b bk bk bk...

Page 26: ...ove front panel to gain access see section 6 8 Remove control box lid by undoing the four securing screws two on control box two on the heat shield and lift off see diagram 10 1 Carefully pull the boi...

Page 27: ...iagram 10 5 When fitting the replacement make sure that the air pressure tubes are fitted as shown in diagram 10 5 and the electrical connections are made as shown in wiring diagram 9 4 10 9 Fan Remov...

Page 28: ...serial number information from the data label The data label is positioned on the heat shield see diagram 6 1 Key No Part No Description GC Part No 1 2000461752 Multifunctional control 2 221732 Fan 3...

Reviews: