37
51
9.17
AUTO AIR VENT
Refer to Figur
e 48
a)
Ensur
e supply voltage is isolated.
b)
Drain down the appliance; r
efer to section 9.19.
c)
Disconnect the vent tube fr
om the auto air vent and check that
it is free from blockage.
d)
Unscr
ew the auto air vent, and fit replacement.
e)
Re-assemble in r
everse order; ensure that all joints and seals
are correctly re-fitted.
f)
Open the isolating cocks and vent air fr
om the system using
the manual air vent. Re-pressurise the system as necessary and
check for water leaks.
9.18
CONTROL PCB
Refer to Figur
es 24, 31 and 52
a)
Ensur
e supply voltage is isolated.
b)
Remove the casing fr
ont panel, unscrew and lower the control
fascia panel.
c)
Unplug the electrical leads fr
om the PCB. Refer to section 7.
d)
Unplug the BCC if fitted.
e)
Unscr
ew and remove the PCB plastic cover.
f)
Unclip the user inter
face ribbon cable.
g)
Unclip the PCB and withdraw
.
h)
Fit the new PCB and plug in the BCC if pr
eviously used.
i)
Re-assemble in r
everse order, ensuring user interface ribbon
cable is attached securely.
52
PCB HOUSING
BCC
Electrical
Connectors
Securing
Screws
•
•
If the boiler r
equires resetting turn the control knob anti-clockwise to
'STANDBY' position and then back to 'ON' within two seconds.
Refer to section 5.4.