CJ
OM/20
09/re
v2/EN
8
Splice Strip / U-Channel Assemblies
U-Channel
A
A
B
Splice Strip:
For hoods placed
back to back:
Slide Splice Strip B over bottom of hoods
fi rst, then over top, secure by welding together.
For hoods placed
end to end
: Slide over bottom front edge fi rst then over
top, secure by welding together, or as an option using screws for models with
supply plenum.
Fig. 1
Fig. 2
U-Channel:
For hood models that are placed
back to back
(as shown in Fig. 1):
Slide the U-Channel A up over the back of the hood systems, and secure
with sheet metal screws.
For hood models that are placed
end to end
(as shown in Fig. 2):
Pry apart the U-Channel at one end and slide over the end panels, fastening
in place, fi tting around the perimeter of the hood systems.
Installation Notes:
B
Splice Strip
B
Splice Strip
Hoods shown end to end
Hoods shown back to back
A
B
A
U-Channel