3
Base station
• Remove the screen protector from the display.
• Open the battery compartment (14) and insert three AAA
Micro batteries with the correct polarity.
• Then close the battery compartment cover.
4.2 Replacing the batteries
Note – Replacing the batteries
• Note that the stations have to be resynchronised each
time after you change the batteries in the measuring or
base station.
• To do this, remove the batteries from the other station and
then reinsert them, or change them as required.
Measuring station
• Open the battery compartment (18), remove and properly
dispose of the depleted batteries, and insert two new AAA
Micro batteries with the correct polarity. Then close the
battery compartment cover.
Base station
• Open the battery compartment (14), remove and properly
dispose of the depleted batteries, and insert three new AAA
Micro batteries with the correct polarity. Then close the
battery compartment cover.
5. Installation
Note – Installation
• We recommend initially placing the base and measuring
stations in the intended locations without installing them
and making all the settings described in
6. Operation
– to do.
• Only install the stations once the appropriate settings
have been made and a stable wireless connection is
established.
Note
• The wireless transmission range between the measuring
and base stations is up to 50 m in open spaces.
• Before installation, ensure that wireless transmission
will not be disrupted by interference or obstacles like
buildings, trees, vehicles, high-voltage lines, etc.
• Before the final installation, ensure that there is sufficient
reception between the intended installation locations.
• When installing the measuring station, ensure that it is
protected from direct sunlight and rain.
• The international standard height for measuring air
temperature is 1.25 m (4 ft) above ground.
Warning
• Buy special or suitable installation material from a
specialised dealer for wall-mounting.
• Ensure that no faulty or damaged parts are installed.
• Never apply force during installation. This could damage
the product.
• Before installation, ensure that the chosen wall is suitable
for the weight to be mounted, and make sure that there
are no electrical wires, water, gas or other lines at the
installation site on the wall.
• Do not mount the product above locations where persons
might linger.
5.1. Base station
• Use the base to position the base station (16) on a level
surface.
• Alternatively, you can install the base station on a wall using
the opening (15) on the back.
5.2. Measuring station
• You can also position the measuring station on a level
outdoor surface.
• We recommend installing the measuring station securely on
an outdoor wall.
• Install an anchor, screw, nail, etc. in the wall of your choice.
• Hang up the base/measuring station using the opening (17)
intended for this purpose.
6. Operation
Note
Hold down the ‘CH | ’ button (10) or the ‘MEM | ’ button
(12) to select the values faster.
6.1. Connection to the measuring station
• After you insert the batteries, the base station automatically
searches for a connection to the measuring station and
performs initial setup.
N
ote
• Initial setup takes approx. 2 minutes.
• During connection, the wireless symbol on the measuring
station will flash (13).
• Do not press any buttons during setup. Otherwise, values
may not be transmitted correctly and there is a risk of
value errors and inaccuracies.
• The setup process is completed when the indoor (7/8) and
outdoor (2/3) measurement data is displayed.
• The measured value is automatically updated by the base
device about every 45 seconds.
• If the temperature is outside of the measuring range,
--.-
(lower than minimum temperature) or
--.-
(higher than
maximum temperature) will appear on the temperature
display.