5
5. Installation
Note – Installation
•
We recommend initially placing the base and measuring stations in
the intended locations without installing them and making all the
settings described in
6. Operation
.
•
Only install the stations once the appropriate settings have been
made and a stable wireless connection is established.
Note
•
The wireless transmission range between the measuring and base
stations is up to 100 metres in open spaces. Before installation,
ensure that wireless transmission will not be disrupted by interference
or obstacles like buildings, trees, vehicles, high-voltage lines, etc.
•
Before the final installation, ensure that there is sufficient reception
between the intended installation locations.
•
When installing the measuring station, ensure that it is protected
from direct sunlight and rain.
•
The international standard height for measuring air temperature,
according to the German Meteorological Service, is 2 m (6.5 ft)
above ground.
Warning – Batteries
•
Buy special or suitable installation material from a specialised
dealer for wall-mounting.
•
Ensure that no faulty or damaged parts are installed.
•
Never apply force during installation. This could damage the
product.
•
Before installation, ensure that the chosen wall is suitable for the
weight to be installation, and make sure that there are no electrical
wires, water, gas or other lines in the wall at the installation site.